BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Lake City, Florida. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

As of June 15, 2020, construction is ready to commence and anticipated to be complete June 2022. The owner has selected a Design Builder.The project is expected to start construction in January 2020 Project Description : I-10 Widening from I-295 to I-95 The scope of work includes all investigation, design, permitting, coordination, final approved construction documents, and construction activities necessary for the construction of the widening of I-10 from I-295 to I-95 and additional improvements. BUDGET AMOUNT 439100-1-52-01: $128,215,202.00 439100-1-56-01: $3,000,000.00 Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. LOI's shall be sent to: d2.designbuild@dot.state.fl.us Exempt Documents are available for this project. To receive the documents, please download, complete the Exempt Documents Request Form No. 050-020-26, and submit it along with a copy of the requestor-s photo ID as specified per the form to Jim Brown in the Procurement Office at d2designbuild@dot.state.fl.us. The documents will emailed to you upon receipt of this form. Financial Management Number(s): 43910015201 43910015601 Selection Method : Adjusted Score Type Response Requested : Letter of Interest Maximum Number of Pages: 10 Additional Bridge Design Work Types : For the bridge structural elements, the D-B Firm must be prequalified in either work type 4.1.2 (Minor Bridge Design) OR 4.2.1 (Major Bridge Design-Concrete) OR 4.2.2 (Major Bridge Design - Steel). The qualifications of the D-B Firm must be consistent with the structure type which will be proposed in the D-B Firm-s LOI and technical proposal. DBE/MBE Requirements: See preamble. Special Notes: The Stipend amount for this project is $270,540. Stipends will be paid to shortlisted firms based on the guidelines noted in the preamble of this advertisement. In accordance with Conflict of Interest Procedure for Dept. Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 2 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. C9R75 STV Incorporated C9F11 Hanson Professional Services Inc. Southeastern Surveying and Mapping Corporation CSI Geo, Inc. C9E03 Atkins, member of the SNC-Lavalin Group Estimated Contract Time: 1,500 calendar days TRC Members Craig Teal, Design Project Manager David Tyler, PD&E Project Manager Thomas Butler, Construction Project Manager Martin Hall, Jacksonville Construction. Advertisement Date : 31OCT2018 Phase1 Selection Cmte. Meeting : 14JAN2019 Time: 10:00AM LOI Scores Notification Date : 14JAN2019 Time: 02:00PM Deadline for Election to Participate in Phase2 : 16JAN2019 Time: 12:00PM Posting of Shortlist : 16JAN2019 Time: 05:00PM Mand. Pre-Proposal Meeting Date: 31JAN2019 Time: 10:00AM Phase 2 Tech. Proposal Due Date: 07JUN2019 Time: 02:00PM Price Proposal Due Date : 07AUG2019 Time: 10:00AM Proposal Opening Date : 07AUG2019 Time: 10:00AM Final Selection Meeting Date : 12AUG2019 Time: 10:00AM FDOT - I-10 Widening Short Confirmed

Under Construction

Roads / Highways

$176,396,554.00

Public - State/Provincial

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
35
Bidding Soon
662
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2019

June 15, 2020

img_map_placeholder

I-10, Lake City, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.