Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Lake City, Florida. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.
As of June 15, 2020, construction is ready to commence and anticipated to be complete June 2022. The owner has selected a Design Builder.The project is expected to start construction in January 2020 Project Description : I-10 Widening from I-295 to I-95 The scope of work includes all investigation, design, permitting, coordination, final approved construction documents, and construction activities necessary for the construction of the widening of I-10 from I-295 to I-95 and additional improvements. BUDGET AMOUNT 439100-1-52-01: $128,215,202.00 439100-1-56-01: $3,000,000.00 Actual commitment and final execution of this contract is contingent upon an approved legislative budget and availability of funds. LOI's shall be sent to: d2.designbuild@dot.state.fl.us Exempt Documents are available for this project. To receive the documents, please download, complete the Exempt Documents Request Form No. 050-020-26, and submit it along with a copy of the requestor-s photo ID as specified per the form to Jim Brown in the Procurement Office at d2designbuild@dot.state.fl.us. The documents will emailed to you upon receipt of this form. Financial Management Number(s): 43910015201 43910015601 Selection Method : Adjusted Score Type Response Requested : Letter of Interest Maximum Number of Pages: 10 Additional Bridge Design Work Types : For the bridge structural elements, the D-B Firm must be prequalified in either work type 4.1.2 (Minor Bridge Design) OR 4.2.1 (Major Bridge Design-Concrete) OR 4.2.2 (Major Bridge Design - Steel). The qualifications of the D-B Firm must be consistent with the structure type which will be proposed in the D-B Firm-s LOI and technical proposal. DBE/MBE Requirements: See preamble. Special Notes: The Stipend amount for this project is $270,540. Stipends will be paid to shortlisted firms based on the guidelines noted in the preamble of this advertisement. In accordance with Conflict of Interest Procedure for Dept. Contracts (Procedure 375-030-006), the following Firms participated in the development of the conceptual plans or Request for Proposal for this Project and are restricted from participation on a Design-Build Firm without approval from the District 2 Secretary. The Firms identified below may not represent a comprehensive list. Firms not listed below who performed services or who are later retained to perform services on this Project are subject to restriction unless an exception is obtained from the Department. C9R75 STV Incorporated C9F11 Hanson Professional Services Inc. Southeastern Surveying and Mapping Corporation CSI Geo, Inc. C9E03 Atkins, member of the SNC-Lavalin Group Estimated Contract Time: 1,500 calendar days TRC Members Craig Teal, Design Project Manager David Tyler, PD&E Project Manager Thomas Butler, Construction Project Manager Martin Hall, Jacksonville Construction. Advertisement Date : 31OCT2018 Phase1 Selection Cmte. Meeting : 14JAN2019 Time: 10:00AM LOI Scores Notification Date : 14JAN2019 Time: 02:00PM Deadline for Election to Participate in Phase2 : 16JAN2019 Time: 12:00PM Posting of Shortlist : 16JAN2019 Time: 05:00PM Mand. Pre-Proposal Meeting Date: 31JAN2019 Time: 10:00AM Phase 2 Tech. Proposal Due Date: 07JUN2019 Time: 02:00PM Price Proposal Due Date : 07AUG2019 Time: 10:00AM Proposal Opening Date : 07AUG2019 Time: 10:00AM Final Selection Meeting Date : 12AUG2019 Time: 10:00AM FDOT - I-10 Widening Short Confirmed
Under Construction
Roads / Highways
$176,396,554.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2019
June 15, 2020
I-10, Lake City, FL
Related To This Project
Lake City, FL
Bid Date: Jun 02 2022
Lake City, FL
Bid Date: Jun 08 2022
Lake City, FL
Bid Date: Jun 15 2022
Lake City, FL
--
Lake City, FL
Bid Date: Jun 17 2022
Lake City, FL
--
Lake City, FL
Bid Date: Feb 25 2019
Lake City, FL
Bid Date: Jan 12 2023
Lake City, FL
--
Lake City, FL
Bid Date: Sep 25 2019
Lake City, FL
--
Lake City, FL
--
Lake City, FL
Bid Date: Jun 14 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.