Site work, paving and renovation of a mixed-use development in Billings, Montana. Completed plans call for site work for a water / sewer project; for the renovation of a bridge / tunnel; bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Request Category Code: Concrete, Flowable Fill, Excavating Services, General Contractors - Construction, Design-Build, Installation of Water Pipelines, Civil, Construction Manager at Risk, Earthworks Operations, Water Resources Infrastructure, Piping, Pumps or pump stations, Bridges/Overpasses, Reservoir Construction (concrete), Culverts, Waterways, Stormwater Channels The West End Reservoir (WER) project consists of a raw water storage reservoir to be constructed in the former Knife River gravel pits north and south of Hesper Road between South 48th Street West and Shiloh Road on the west end of Billings. The completed project will supply the future West End Water Treatment Plant (WEWTP) with water from the Yellowstone River and provide a valuable recreational amenity to the community. The north reservoir cell is to have an approximate water surface area of 100 acres and depth of 21 feet. The surface elevation of the south cell is to be 10 feet lower than the north cell, 60 acres in size and 20 feet deep. Inlet and outlet structures and spillways will be built for both reservoir cells. A screened, multi-level fixed intake structure will allow water to flow from the WER to the WEWTP directly by gravity or via a wetwell/pump station located outside the WER embankment when pumping the reservoir to the lower levels is desired. Pretreatment sedimentation basins up gradient of the reservoirs will also be built with the project. Other project components may include: o Hesper Road reconstruction and a bridge or other structure to accommodate and outlet works from the north cell to the south cell, and o reservoir access features such as piers, boat ramps, and multi-purpose trails. SOQs received will be ranked by a selection committee using a scoring system based on defined criteria. Approximately three (3) Contractors having the highest ranked SOQs will be required to submit project proposals. The committee will select the final Contractor by evaluating and ranking proposals received from the short-listed Contractors. Preconstruction contract negotiations will ensue with the Contractor having the highest ranked proposal. Pending successful contract negotiations and Billings City Council approval, the Contractor will join the project team consisting of the City of Billings and HDR Engineering. During the preconstruction phase, the Contractor will work as an integral part of the project team to evaluate and further develop the preliminary design, assisting the Engineer and City in identifying opportunities for improvement and offering alternative solutions. The Contractor will develop cost estimates and offer suggestions with respect to means, methods, materials innovations and construction sequencing. During the construction phase, the Contractor will provide the necessary resources and subcontractors to implement the team's design and construct the project. Throughout the entire process, the objective is to maintain a spirit of cooperation and open communication so that project goals and objectives are clearly understood, potential problems are promptly resolved, and upon completion, the project is deemed a success by all. The Contractor or other key personnel cannot team with other partners to submit more than one SOQ. Only one SOQ per Contractor is acceptable, and City receipt of multiple SOQs from a Contractor will disqualify the Contractor. The City of Billings reserves the right to reject any or all SOQs if determined to be in the best interest of the City. The City of Billings is an Equal Opportunity Employer. Contractors interested in submitting SOQs may contact the City of Billings to receive the SOQ Instructions and any addenda that may be issued. For any questions contact: Randy Straus, PE City of Billings Public Works Department Engineering Division 2224 Montana Avenue Billings, MT 59101 Phone: (406) 657-8301, Fax: (406) 237-6291 Email: strausr@billingsmt.gov

Post-Bid

Water / Sewer

$40,000,000.00

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
4
Bidding Soon
43
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2022

November 28, 2022

img_map_placeholder

Multiple Locations, Billings, MT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.