BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a museum in Norman, Oklahoma. Conceptual plans call for the addition of a museum.

For decades, the Firehouse Art Center has offered art classes and artist training for a wide variety of mediums--painting, sculpture, photography, music, drawing, performance art, ceramics, textiles, graphic arts and more. In the past decade, they have dramatically increased their youth programs in conjunction with the Norman Public Schools art education programs. Over the years, the building in Lions Park has served as the main campus for these programs. The building was built as a Fire Station in the 1940's--and was converted to an artist space in the 1970's, when a new fire station was built to replace the Lions Park station. Several improvements have been made to the space over the years; but with increased staffing and enrollment--the space is very under-sized. The Firehouse Board of Directors has proposed a project to raise funds for a building addition--and since the space is owned by the City of Norman, it would be a benefit to both parties if we could speed up the project by sharing the costs through the Room Tax Fund, as proposed here. The first year of funding would be used to hire a design firm to prepare construction documents for the project. A subsequent year would be used to fund the building project. Major improvements would include adding restrooms to the downstairs space, increasing the office space for staff, increasing gallery space for the artists and additional classroom space. As of March 9, 2022, this project is included City of Norman FY 2021-2025 CIP. The project is currently on an indefinite hold. Bidding for designer, contractor and firm construction start date have not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Museum

$400,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
36
Bidding Soon
432
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2022

img_map_placeholder

444 S Flood Ave, Norman, OK


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.