BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work and paving for a mixed-use development in Las Vegas, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; transportation facility; sidewalk / parking lot; and sidewalk / parking lot.

The work to be performed under this contract is for the improvements to the Airport Connector (SR-171) northbound from approximately I-215 to Sunset Road and the I-215 westbound off-ramp to SR-171. The improvements include: Widening the Sunset Road off-ramp from one lane to two lanes to provide additional storage capacity on the ramp for the traffic signal at the Sunset Road and Paradise Road intersection. Widening the northbound Airport Connector from three lanes to four lanes between the WN on-ramp and the Sunset Road exit. Realigning the WN on-ramp to go under the new ramp (ES) bridge. This WN on-ramp lane will join with the two lanes from the northbound Airport Connector and the dedicated lane for Sunset Road exit to form the four-lane northbound Airport Connector section. Constructing a new ramp (ES) that connects the northbound Airport Connector to a dedicated lane for the Sunset Road off-ramp. The ES ramp includes a new grade separation structure over the WN ramp. Realign George Crockett Road (GC) to northbound Airport Connector on-ramp to increase the weave distance between the GC on-ramp and the new ES ramp gore. The improvements generally consist of the bridge structure, retaining walls, pavement rehabilitation, cold planning and overlay, plantmix bituminous paving, curb and gutter, median, sidewalk, traffic signal, pavement markings, signing, street lighting, bridge lighting, bridge underdeck lighting, ITS, utility adjustments, landscape, impact attenuator, fencing, construction traffic control and other related items of work. The work includes demolition, removals and disposal of designated improvements including bituminous pavement, signage, fencing and other related items of work. Question Deadline 05/13/2025 at 5:00 PM PT ESTIMATED COST: $35,236,600 - $38,829,950 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Transportation Terminals

$49,500,000.00

Public - County

Paving, Site Work

3

1

63

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
37
Bidding Soon
433
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

July 21, 2025

Project location map

To Be Determined, Las Vegas, NV

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.