Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 2, 2025 at 8:00 PM
Updated May 3, 2025
Site work and paving for a mixed-use development in Sunrise Manor, Nevada. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of May 02, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Work will generally consist of improvements including plantmix bituminous surface, curb and gutter, sidewalk, median, bridge spanning Las Vegas Wash, channel, storm drain, waterline relocation, fencing, street lights, traffic signal, landscaping, utility adjustments, pavement markings, and signing. The work also consists of miscellaneous removal and disposal and removal and salvage/replacement of designated items, traffic control, dust control, quality control, and other related items of work as specified and shown on the Drawings. ESTIMATED COST: $13,314,977 - $14,716,553. Question Cuttoff Date & Time 01/16/2025 at 5:30 PM PT Should you have any questions, please contact me at (702) 455-4441 or scott.jones@clarkcountynv.gov BID SECURITY in the amount of five percent (5%) of the Total Base Bid amount in the form of a Cashier's Check, Certified Check, Money Order, or Bid Bond, scanned into the Response Attachments tab. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$13,949,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
June 16, 2025
N Sloan Ln, Sunrise Manor, NV
Related To This Project
Sunrise Manor, NV
--
Sunrise Manor, NV
Bid Date: Feb 27 2024
Sunrise Manor, NV
Bid Date: Jan 30 2024
Sunrise Manor, NV
Bid Date: Jan 31 2024
Sunrise Manor, NV
--
Sunrise Manor, NV
--
Sunrise Manor, NV
--
Sunrise Manor, NV
--
Sunrise Manor, NV
Bid Date: Nov 20 2023
Sunrise Manor, NV
--
Sunrise Manor, NV
--
Sunrise Manor, NV
Bid Date: Nov 14 2022
Sunrise Manor, NV
--
Sparks, NV
Bid Date: Dec 10 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
