BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Sunrise, Florida. Conceptual plans call for the renovation of a water / sewer project.

As of April 27 2023, this project was not approved by the City of Sunrise and not moving forward as per source. The majority of the production capacity at the Springtree WTP is a Lime Softening process (24 of 25.5 MGD), and the Biscayne aquifer groundwater source for this process contains significant organic matter available to react with free chlorine during the disinfection process which forms disinfection by-products (DBPs) called tri-halomethanes (THMs) and halo-acedic acids (HAAs), known carcinogens and regulated by the U.S. EPA/FDEP as primary contaminants to be controlled under 80 mg/l and 60 mg/l, respectively. The City injects ammonia in the disinfection process (after filtration) forming chloramines in order to maintain compliance with the DBP Rule, although this process is difficult to regulate continuously due to fluctuations in flow and corresponding chemical demands and can provide a food source for nitrifying bacteria in the distribution system, further complicating the City capability to maintain regulatory compliance for adequate chlorine residual to the customers faucets. This project provides an ion exchange process to substantially remove the organic matter in the lime softening process, reducing DBP formation potential and reducing required amount of ammonia. There is a total of 12 MGD of Ion exchange being proposed under this project. Annual operating expenses are for electricity and salt usage, but there are savings from use of less sulfuric acid and sodium hydroxide. As of November 19, 2021, this project is currently in the FY 2022-2026 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Project Abandoned

Water / Sewer

$10,080,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
46
Bidding Soon
1,109
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2023

img_map_placeholder

4350 Springtree Dr, Sunrise, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.