BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a water / sewer project in Sunrise, Florida. Working plans call for the renovation of a water / sewer project.

UPDATE: https://www.sunrisefl.gov/home/showpublisheddocument/7691/638043009402670000 Unit Substation Transformer at Springtree WTP 500kva 4160volt - which provides power to the main switchgear in the Springtree Water Treatment Plant (WTP) electrical room - requires replacement. This transformer was installed in the 1970’s and has reached its useful life. Additionally this project will include the replacement of the Robicon Variable Frequency Drive (VFD) which operate the main high service pumps which have become obsolete and parts are difficult to obtain. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of November 21, 2022, further details regarding design and construction have not been identified. _____________________________________________ The Springtree Water Treatment Plant (WTP) high service pump "B" VFDs, medium voltage motor control center (MV-MCC), and switchgear are approximately 30-years old and were reviewed as part of the Water and Wastewater Master Plan facilities condition assessment process. This project includes the replacement of existing high service pump "B" VFDs, MV-MCC and utility/distribution switchgear, electrical substation #1 and #2, and other mechanical and electrical distribution equipment as well as the installation of new pad mounted transformers, 480V switchboard, 5kV raceways and cables, 480V raceways, and new side "B" high service pumps and motors. The aged switchgear is comprised of major electrical components from several manufacturers making the coordination of repairs challenging while increasing the risk of failure. Some of the outdated technology and obsolete system components reduce flexibility and reliability and increase the difficulty of obtaining parts for repair. Project is included in the City of Sunrise's FY 2021-2025 CIP. Per the owner, as of December 14, 2021, a design team has been selected. Owner states that construction is anticipated to begin around March/April of 2022. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Water / Sewer

$5,801,011.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
55
Bidding Soon
1,127
All Active Projects
467
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.