BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Omaha, Nebraska. Completed plans call for the renovation of a 164,166-square-foot educational facility.

"Parent Project" --- BP#2, BP#3 (went out for Bid) As of July 07, 2022, All bid packages have been awarded and no more bid packages coming out. The previous solicitation is included below for reference: In order to participate you must submit your Statement of Qualifications electronically through this eBid system. No paper submissions will be accepted. The University of Nebraska intends to procure a qualified contractor to provide pre-construction services and construction services as the Construction Manager at Risk (CMR) for the Durham Science Center Renovation, NU FPC Project 12439. The estimated construction cost for the CMR GMP is $22,567,000. The total estimated construction budget including the GMP, in-house construction services, and the Owner's contingency is $25,665,000. The University of Nebraska at Omaha proposes to renovate the 164,166 GSF Durham Science Center on the UNO D odge St Campus. The building renovation will update architectural, mechanical, plumbing, and electrical systems. Building envelope/interior finish and code issues to be addressed in the renovation include new roof, glazing updates, entrance vestibules, canopies, and curtain wall updates, ADA and Life Safety Code compliance modifications, lab updates, along with interior finish and signage/wayfinding updates. MEP system issues to be addressed include air handler replacement, HVAC ductwork updates, lab fume hood replacement, fire dampers and controls, various building plumbing systems updates, sprinkler system modifications, electrical distribution systems, new emergency generator, LED lighting upgrades, data & AV system cabling & equipment updates, and security/card access systems. The Scope of the work is more completely described in the BOR Program Statement Item dated October 25, 2019 and in other documents included in this Request for Qualifications (RFQ). The method of contractor selection has not been determined at this time. Total Estimated Project Construction Budget is $25,665,000 QA date 1/25/2021 4:00 PM ET Shortlist Confirmed.

Award

Educational

$22,567,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
29
Bidding Soon
525
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2021

May 30, 2022

img_map_placeholder

6001 Dodge St, Omaha, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.