BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2019 at 8:00 PM

Updated November 15, 2023

Site work for a civil project in Cadotte Lake, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

Bridge Culvert Replacement and Other Work 986:06, B.F. 81163 – Carrying Hwy. 986 over a Tributary to Lubicon River, E. of Little Buffalo Peace Region Approximate Quantities: 15 days Total Suspended Solids (TSS) Testing 1 lump sum Demolition and Disposal of Bridge Structure 1 lump sum excavation – structural 1 lump sum CSP with couplers – Supply (2400 mm Dia.) 1 lump sum CSP – Assembly (2400mm Dia.) 70 cubic metres Heavy Rock Riprap (Class 1) 1 lump sum Roadway Work 100 metres Fibre/Straw Rolls 100 metres Erosion Control Barrier (Silt Fence) Contractor to supply all materials. Documents can be obtained from www.purchasingconnection.ca and www.coolnetalberta.com.

Award

Bridges / Tunnels

$458,005.00

Public - State/Provincial

Site Work

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
1
Bidding Soon
35
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2019

February 11, 2019

Project location map

AB-986, Cadotte Lake, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.