BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Gainesville, Georgia. Completed plans call for the construction of a transportation facility; for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; and water / sewer project.

As of February 26, 2024, construction is underway and the project already bid. Questions related to Bidding Documents and Project site shall be directed in writing to A/E, attention Michael Thomas, PE, email: mthomas@moffattnichol.com. No questions will be accepted after Tuesday, October 24th, 2023, at 5:00 P.M. All technical questions related to the proposed work should be submitted in writing and directed to Architect/Engineers Project Manager, Michael Thomas mthomas@moffattnichol.com or 404-205-8531. The proposed work consists of earthwork, erosion sedimentation and pollution control (ESPC), grading and drainage, road paving, water and sanitary sewer utilities, dry utilities, lighting, fence and gates, rail, landscaping, and building structures for a new GPA Inland Port. The project is located at the new Northeast Georgia Inland Port, Gainesville, Georgia. The proposed work consists of earthwork, erosion sedimentation and pollution control (ESPC), grading and drainage, road paving, water and sanitary sewer utilities, dry utilities, lighting, fence and gates, rail, landscaping, and building structures for a new GPA Inland Port. The project is located at the new Northeast Georgia Inland Port, Gainesville, Georgia. Bid must be accompanied by a bid security equal to 10 percent of bid sum. If a construction contract is awarded, successful bidder will be required to furnish performance and payment bonds, each equal in amount to contract sum. Enclose Bid and attachments in a sealed, opaque envelope (hereinafter referred to as "bid envelope"). Address bid envelope to The Georgia Ports Authority, P.O. Box 2406, Savannah, GA 31402. Attention: Mr. Christopher B. Novack, Senior Director of Engineering and Facilities Maintenance. Include the following in lower-left corner of bid envelope: "Bid for Northeast Georgia Inland Port, Contract No. 1707-0914" and Bidder's name, address, and telephone number. LIQUIDATED DAMAGES: If the Contractor fails to achieve Substantial Completion of the entire Work within the time stated in Section 1.6.B, the Owner will suffer financial loss. To offset such loss, the Contractor and the Contractor's Surety shall be liable for and shall pay the Owner One Thousand Dollars ($1,000.00) for each day the Work remains incomplete in excess of time allotted for Substantial Completion. Such amount shall be paid to the Owner as liquidated damages, not as penalty, and shall be included in the Agreement between Owner and Contractor. Questions related to Bidding Documents and Project site shall be directed in writing to A/E, attention Michael Thomas, PE, email: mthomas@moffattnichol.com. No questions will be accepted after Tuesday, October 24th, 2023, at 5:00 P.M. Owner also has right to reject any and all Bids for any reason, to accept any Bid considered best for Owner's interests, and to waive informalities or irregularities in any Bid. Bid must be accompanied by a bid security equal to 10 percent of bid sum. If a construction contract is awarded, successful bidder will be required to furnish performance and payment bonds, each equal in amount to contract sum. Enclose Bid and attachments in a sealed, opaque envelope (hereinafter referred to as "bid envelope"). Address bid envelope to The Georgia Ports Authority, P.O. Box 2406, Savannah, GA 31402. Attention: Mr. Christopher B. Novack, Senior Director of Engineering and Facilities Maintenance. Include the following in lower-left corner of bid envelope: "Bid for Northeast Georgia Inland Port, Contract No. 1707-0914" and Bidder's name, address, and telephone number. LIQUIDATED DAMAGES: If the Contractor fails to achieve Substantial Completion of the entire Work within the time stated in Section 1.6.B, the Owner will suffer financial loss. To offset such loss, the Contractor and the Contractor's Surety shall be liable for and shall pay the Owner One Thousand Dollars ($1,000.00) for each day the Work remains incomplete in excess of time allotted for Substantial Completion. Such amount shall be paid to the Owner as liquidated damages, not as penalty, and shall be included in the Agreement between Owner and Contractor. Owner also has right to reject any and all Bids for any reason, to accept any Bid considered best for Owner's interests, and to waive informalities or irregularities in any Bid.

Under Construction

Transportation Terminals

$105,181,262.00

Public - Federal

New Construction, Outdoor Lighting, Paving, Site Work

317

31

225

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
318
Active Projects
168
Bidding Soon
2,242
All Active Projects
1,022
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 10, 2023

February 12, 2024

img_map_placeholder

To Be Determined, Gainesville, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.