Published March 7, 2019 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Clear Spring, Maryland. Completed plans call for the renovation of a educational facility.

Selective demolition and interior renovations to create an interior security vestibule at the school's main entrance and to convert the adjacent space into the new general office and health suite. It is expected that Asbestos Containing Materials (ACMs) will be encountered in the Work as identified in the Contract Documents. The Contractor is responsible for the proper abatement of ACMs, and independent third party air monitoring/Industrial Hygienist services as required, within the project area as part of the Contract Work. Notice is hereby given that Washington County Public Schools will accept sealed bids for the purpose of establishing a contract to construct security improvements at Clear Spring Middle School. BOE approval 2/2019 Term start 6/17/2019 Term end Substantial Completion Date 8/23/2019 - Final Completion 9/27/2019 This bid/project is subject to Minority Business Enterprise Procedures (MBE) and Prevailing Wage Rates. The overall certified MBE subcontracting goal for this project is 6%. There are no subgoals Deadline for Written Questions Submission: December 19, 2018 at 12:00 PM EST Bids delivered in person should be handed to a Purchasing Department staff member prior to the bid due date/time to ensure the bid is properly filed in advance of the Bid Opening. Bids not received prior to the day/time designated for the bid opening, or bids not submitted to the Purchasing Staff may not be properly filed. Such bids, upon discovery by the Purchasing Official, will be refused and/or returned unopened to the Bidder. The Purchasing Department is open Monday through Friday, 8:00 am - 12:00 pm and 1:00 pm - 4:30 pm local time, except national and school holidays. No bidder may withdraw his bid for a minimum period of sixty (60) calendar days after the day of the bid opening. Bidder must use the AIA bond form versions provided herein. Only AIA forms that have been reviewed for acceptance by WCPS legal counsel will be acceptable. The Owner may make such investigations as he deems necessary to determine the ability of the Bidder to perform the Work, and prospective Bidders may be required to furnish evidence of performance of similar projects of similar magnitude and complexity and all such information and data as requested. The Owner reserves the right to reject any bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy the Owner that such bidder is properly qualified to carry out the obligation of the Contract and to complete the Work contemplated therein. The Owner reserves the right to reject any or all bids, to waive irregularities in the bids, select alternates in any order and to make the award in the manner that the WCBOE determines will best serve the interests of WCPS. Bid Result Non-Prevailing Wage GRC General Contractor Inc-$ 369,538 Prevailing Wage GRC General Contractor Inc-$ 446,073

Award

Educational

$815,611.00

Public - County

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Alternates, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Construction Facilities, First Aid Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Fire Suppression Systems Insulation, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Mobile Plant Equipment, General Vehicles, Vans
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
79
Bidding Soon
1,766
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2019

June 17, 2019

img_map_placeholder

12628 Broadfording Rd, Clear Spring, MD

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Security Improvements at Clear Spring Middle School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.