Site work for a water / sewer project in Warrensburg, Missouri. Working plans call for site work for a water / sewer project.
***As of March 1,2019 project has been cancelled due to above budget. No re-bid decision yet. Any and all communication from bidders regarding specifications, requirements, competitive procurement process, etc., must be directed to Roderick Woolen at rwoolen@ucmo.edu. Communication made with parties outside of Procurement may result in your solicitation response being disqualified. MBE/WBE Percentage Goal: a. The bidder shall have as a goal subcontracting not less than five percent (5%) of the awarded contract price for work to be performed of MBE/WBE(s). The last time/date to submit questions is 10:00AM CT on Thursday, January 10, 2019. Email or fax questions to the Buyer as indicated in the Bid Contact Information section; The project start date shall be no earlier than Friday, March 15, 2019. The desired project completion date shall be no later than 5:00 p.m. CT on Saturday, March 23, 2019; Expected announcement of award is during the month of January 2019. This requirement may require UCM Board of Governors approval, which may delay the award announcement; All prospective bidders may attend the bid closing held on Thursday, January 17, 2019 at 2:00PM CT at the Procurement Office Conference Room 113, 415 East Clark Street, Building A, Warrensburg, MO 64093. The Morrow-Garrison Student Recreation and Wellness building at the University of Central Missouri in Warrensburg, MO was completed in 2010. This project utilizes a geothermal condenser water system containing approximately 20,000 gallons of water with 10% methanol and 3% glycol inhibitor (by volume). A summary of the equipment connected to condenser water includes (approximately): - 85 water source heat pumps with autoflow balance valves - 3 water source heat pump DOAS units with natural gas reheat and energy wheel (roof) - 3 water source heat pump RTUs (roof) - 2 water-to-water heat pumps - 1 fluid cooler (roof) - 1 expansion tank - 1 air separator - 1 air-dirt separator - 8 pumps SCOPE OF WORK: The following is a description of the scope of work required for this project: - Disconnected and loop supply/return lines prior to purging of equipment. Hydronic accessories need to be protected from elevated system pressure during purging. - Care should be taken to not damage hydronic accessories and components during system purging, including valves, strainers, gauges and other components. - Conduct a purge of both the ground source and building condenser water systems o This must be done with specialized pumping equipment designed for system purging. Utilizing the building pumps is not possible. o Finch Drilling is aware of the project and can provide a price for this portion of the work. Alternate companies may also provide this service provided sufficient equipment history of this work are available. o System pressure during the purge shall not exceed 70 PSI. - Flush each unit condenser individually. - Clean and inspect strainers and autoflow valve cartridges. Replace strainers and cartridges as necessary - Re-connect all equipment once purge is complete and verify proper operation. - Document deficient components that require repair or replacement. Provide a description of the component, issue, and recommended action as well as estimated costs.
Final Planning
Water / Sewer
$100,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 17, 2019
September 1, 2019
500 S Maguire St, Warrensburg, MO
Related To This Project
Warrensburg, MO
Bid Date: Dec 29 2022
Warrensburg, MO
Bid Date: Apr 28 2022
Warrensburg, MO
Bid Date: Mar 31 2022
Warrensburg, MO
Bid Date: May 12 2022
Warrensburg, MO
Bid Date: May 23 2022
Warrensburg, MO
Bid Date: Apr 21 2022
Warrensburg, MO
Bid Date: May 06 2022
Warrensburg, MO
Bid Date: Nov 09 2022
Warrensburg, MO
Bid Date: Nov 09 2022
Warrensburg, MO
Bid Date: Oct 08 2021
Warrensburg, MO
Bid Date: Nov 02 2022
Warrensburg, MO
Bid Date: Nov 02 2022
Warrensburg, MO
Bid Date: Nov 02 2022
Warrensburg, MO
Bid Date: Nov 02 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.