BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Warrensburg, Missouri. Working plans call for site work for a water / sewer project.

***As of March 1,2019 project has been cancelled due to above budget. No re-bid decision yet. Any and all communication from bidders regarding specifications, requirements, competitive procurement process, etc., must be directed to Roderick Woolen at rwoolen@ucmo.edu. Communication made with parties outside of Procurement may result in your solicitation response being disqualified. MBE/WBE Percentage Goal: a. The bidder shall have as a goal subcontracting not less than five percent (5%) of the awarded contract price for work to be performed of MBE/WBE(s). The last time/date to submit questions is 10:00AM CT on Thursday, January 10, 2019. Email or fax questions to the Buyer as indicated in the Bid Contact Information section; The project start date shall be no earlier than Friday, March 15, 2019. The desired project completion date shall be no later than 5:00 p.m. CT on Saturday, March 23, 2019; Expected announcement of award is during the month of January 2019. This requirement may require UCM Board of Governors approval, which may delay the award announcement; All prospective bidders may attend the bid closing held on Thursday, January 17, 2019 at 2:00PM CT at the Procurement Office Conference Room 113, 415 East Clark Street, Building A, Warrensburg, MO 64093. The Morrow-Garrison Student Recreation and Wellness building at the University of Central Missouri in Warrensburg, MO was completed in 2010. This project utilizes a geothermal condenser water system containing approximately 20,000 gallons of water with 10% methanol and 3% glycol inhibitor (by volume). A summary of the equipment connected to condenser water includes (approximately): - 85 water source heat pumps with autoflow balance valves - 3 water source heat pump DOAS units with natural gas reheat and energy wheel (roof) - 3 water source heat pump RTUs (roof) - 2 water-to-water heat pumps - 1 fluid cooler (roof) - 1 expansion tank - 1 air separator - 1 air-dirt separator - 8 pumps SCOPE OF WORK: The following is a description of the scope of work required for this project: - Disconnected and loop supply/return lines prior to purging of equipment. Hydronic accessories need to be protected from elevated system pressure during purging. - Care should be taken to not damage hydronic accessories and components during system purging, including valves, strainers, gauges and other components. - Conduct a purge of both the ground source and building condenser water systems o This must be done with specialized pumping equipment designed for system purging. Utilizing the building pumps is not possible. o Finch Drilling is aware of the project and can provide a price for this portion of the work. Alternate companies may also provide this service provided sufficient equipment history of this work are available. o System pressure during the purge shall not exceed 70 PSI. - Flush each unit condenser individually. - Clean and inspect strainers and autoflow valve cartridges. Replace strainers and cartridges as necessary - Re-connect all equipment once purge is complete and verify proper operation. - Document deficient components that require repair or replacement. Provide a description of the component, issue, and recommended action as well as estimated costs.

Final Planning

Water / Sewer

$100,000.00

Public - State/Provincial

Site Work

39

1

4

4

Subscribe For Documents

130 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
31
Bidding Soon
718
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2019

September 1, 2019

img_map_placeholder

500 S Maguire St, Warrensburg, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.