Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated February 26, 2025
Site work for a mixed-use development in Fort Mc Coy, Florida. Conceptual plans call for site work for a playground / park / athletic field; and water / sewer project.
The Gores Landing Improvement is a master plan project that will be completed in two phases. Phase 1 will include the design, engineering, permitting, and removal of existing structures and new construction. Phase 2 will include the removal of existing restrooms; construction of ADA-accessible restrooms that includes showers, mirrors, and hot water; replace existing antiquated wastewater system; replace existing boat ramp with single lane ramp; rework boat channel; establish designated trailer parking with ADA access; construct ADA lateral fishing platform; establish designated campsites with amenities and ADA access; pave interior drive, handicap parking, and sidewalks; install bear-proof trash cans; and establish designated host camper site. This project will significantly increase safety for park guests utilizing the boat ramp, improve the functionality of the boat ramp, address ADA accessibility, and enhance the overall guest experience. Additionally, this project will enhance environmental safety by modernizing the wastewater treatment system. Gores Landing is a resource-based park providing opportunities for camping and aquatic recreation. This project consists of a four-hole with showers park standard restroom facility, a two-stall parking lot, ADA compliant ramp, and a new advanced treatment sewage system at the park. The restroom will include a well, septic system, lighting and power, mirrors, paper towel and soap dispensers, grab bars, and ADA sidewalks. Facilities management department involvement will include overseeing the construction of an 800+/- sf restroom facility. The Feasibility study was completed in FY 2022. The restroom facility will be located near the existing pedestrian parking lot. As of February 25, 2025, this is the conceptual and prelimeinary design phase. An engineer has not been selected. It is anticipated bidding and construction will start in 2026. This project is included in the Marion County Fiscal Year 2025-2029 CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Playgrounds / Parks / Athletic Fields
$912,524.00
Public - County
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2028
13800 NE 98th St, Fort Mc Coy, FL
Related To This Project
Fort Mc Coy, FL
Bid Date: Jul 06 2022
Fort Mc Coy, FL
Bid Date: Jul 25 2022
Fort Mc Coy, FL
Bid Date: Apr 21 2023
Fort Mc Coy, FL
Bid Date: Jan 31 2024
Fort Mc Coy, FL
Bid Date: Sep 26 2019
Fort Mc Coy, FL
Bid Date: Jan 06 2025
Cape Coral, FL
Bid Date: Jan 18 2023
New Smyrna Beach, FL
--
Fort Myers, FL
Bid Date: Dec 27 2022
Daytona Beach, FL
--
Daytona Beach, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
