BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of a detention facility in Saint Clairsville, Ohio. Conceptual plans call for the demolition of a 16,831-square-foot detention facility; for site work for a detention facility; and for the renovation of a detention facility.

As of September 15, the project has been cancelled. *The original solicitation is listed below for reference. -- Belmont Correctional Institute (BeCI) is an adult minimum to medium-security prison facility operated by the Ohio Department of Rehabilitation and Correction (ODRC). BeCI was constructed in 1993 - 1994 and is comprised of approximately 15 buildings with a prison population of 2,673. The Transitional Program Unit (TPU) (Bldg 4) is 16,831 square feet. It is the intent of ODRC to completely demolish this building and replace with new stand-alone TPU building. Location of the new building may be in the same/current location or a new location within the confines of the secure perimeter. The development of a complete Program of Requirements (POR) will also be included as part of the Professional Design as an Additional Service. The development of the POR will include a comprehensive survey/field investigation of the building site, existing building and building systems. The project scope will be evaluated, prioritized and defined to align with the project budget. Evaluation of the project construction schedule will also be a part of the POR stage. The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner's project requirements. Participate in the Encouraging Growth, Diversity & Equity (EDGE) Program as required by statute and the Agreement. As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types. Professional Services Start: 07 / 19. Professional Services Completed: 06 / 22.

Project Abandoned

Jails / Prisons

$5,745,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
64
Bidding Soon
984
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

img_map_placeholder

68518 Bannock Uniontown Rd, Saint Clairsville, OH

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.