BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Humble, Texas. Completed plans call for site work for a transportation facility; and for the construction of a 48,084-square-foot, two-story above grade transportation facility.

Late submittals and submittals delivered to locations other than the one specified in the RFQ document will not be reviewed for any reason. The MWBE goal is 38% (MBE: 28%; WBE: 10%) . 15170-01 For additional information, please email Alfredo Oracion, Sr. Procurement Specialist, Houston Airport System, (alfredo.oracion@houstontx.gov). The scope of services is primarily the construction of a new VMF that will be located south of Will Clayton Pkwy and just east of the existing Fire Station #92, Fleet Fuel Station, and the Vehicle Wash, see bridging documents. The existing site currently supports a single athletic field with associated fencing, bleachers, and shade canopies. The field and its supporting accessories will be removed to allow for the completion of the new building. The overall program includes constructing the proposed (approx. 51,000sf) Vehicle Maintenance Building, covered exterior work area, mechanical yard, tire storage, trash enclosure, and associated site concrete paving. Landscaping, a fenced and lighted accommodates 178 vehicles is also included.The VMF will be shared by four (4) separate Houston Airport System entities that include Vehicle Maintenance (VMF), Airside Operations (OPS), Supply Chain Management (SCM), and a Shuttle Bus Maintenance provider. Each group must have the ability to operate independently within their respective spaces and the spaces shall be secured. Build-out of the Vehicle Maintenance Facility shall be completed in 2 phases. Phase 1 includes some site work, building shell, and the build-out of the VMF and Shuttle Bus Maintenance areas. Shuttle Bus Maintenance must be able to occupy their designated area by December of 2019. Phase 2 of construction includes the build out of the second floor for SCM, OPS, remaining sitework, and any remaining work related to commissioning and closeout, (note that the design documents do provide an approved layout for the SCM and OPS spaces for reference).HAS will use a Design Build delivery method to provide the new Vehicle Maintenance Facility. Refer to the Exhibits attached to this Scope of Services document for the Overall Project Location Map and basic conceptual and planning design documents.All work shall be considered to be performed while maintaining the active operational status of the existing Airport facilities and including maintaining uninterrupted public access to all terminals and continual use by the public of all public roads.

Award

Transportation Terminals

$1,727,506.00

Public - City

LEED Certification, New Construction, Site Work

171

39

4

Subscribe For Documents

100 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
62
Bidding Soon
2,757
All Active Projects
1,067
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.