Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a transportation facility in Humble, Texas. Completed plans call for site work for a transportation facility; and for the construction of a 48,084-square-foot, two-story above grade transportation facility.
Late submittals and submittals delivered to locations other than the one specified in the RFQ document will not be reviewed for any reason. The MWBE goal is 38% (MBE: 28%; WBE: 10%) . 15170-01 For additional information, please email Alfredo Oracion, Sr. Procurement Specialist, Houston Airport System, (alfredo.oracion@houstontx.gov). The scope of services is primarily the construction of a new VMF that will be located south of Will Clayton Pkwy and just east of the existing Fire Station #92, Fleet Fuel Station, and the Vehicle Wash, see bridging documents. The existing site currently supports a single athletic field with associated fencing, bleachers, and shade canopies. The field and its supporting accessories will be removed to allow for the completion of the new building. The overall program includes constructing the proposed (approx. 51,000sf) Vehicle Maintenance Building, covered exterior work area, mechanical yard, tire storage, trash enclosure, and associated site concrete paving. Landscaping, a fenced and lighted accommodates 178 vehicles is also included.The VMF will be shared by four (4) separate Houston Airport System entities that include Vehicle Maintenance (VMF), Airside Operations (OPS), Supply Chain Management (SCM), and a Shuttle Bus Maintenance provider. Each group must have the ability to operate independently within their respective spaces and the spaces shall be secured. Build-out of the Vehicle Maintenance Facility shall be completed in 2 phases. Phase 1 includes some site work, building shell, and the build-out of the VMF and Shuttle Bus Maintenance areas. Shuttle Bus Maintenance must be able to occupy their designated area by December of 2019. Phase 2 of construction includes the build out of the second floor for SCM, OPS, remaining sitework, and any remaining work related to commissioning and closeout, (note that the design documents do provide an approved layout for the SCM and OPS spaces for reference).HAS will use a Design Build delivery method to provide the new Vehicle Maintenance Facility. Refer to the Exhibits attached to this Scope of Services document for the Overall Project Location Map and basic conceptual and planning design documents.All work shall be considered to be performed while maintaining the active operational status of the existing Airport facilities and including maintaining uninterrupted public access to all terminals and continual use by the public of all public roads.
Award
Transportation Terminals
$1,727,506.00
Public - City
LEED Certification, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 28, 2019
July 22, 2019
4551 Will Clayton Pkwy, Humble, TX
Related To This Project
Humble, TX
Bid Date: May 26 2022
Humble, TX
--
Humble, TX
Bid Date: Oct 25 2018
Humble, TX
Bid Date: Feb 14 2019
Humble, TX
--
Humble, TX
--
Humble, TX
Bid Date: Aug 03 2022
Humble, TX
--
Humble, TX
--
Humble, TX
--
Humble, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.