BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work and paving for a civil project in Webster, Texas. Design plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The main source of water for the City of Webster and several other entities is the Southeast Water Purification Plant that is operated by the City of Houston. Constructed in the 1970's, the 42" WL from the plant to the City has reached the end of its life. The line has required numerous repairs and has been de-rated from 100 psi to 80-85 psi due to its poor condition. At 54" in diamter, the new line will have extra capacity, giving the City increased water rights from 4.05 MGD to 5.83 MGD. This project also includes replacing the 24" Bay Area WL with a new 36" WL that will go west from SH3 in a corridor further south from Bay Area. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of November 14, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$4,716,370.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2028

Project location map

TX-3, Webster, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.