Site work for a water / sewer project in Houtzdale, Pennsylvania. Completed plans call for site work for a water / sewer project.

HOUTZDALE MUNICIPAL AUTHORITY, HOUTZDALE, PENNSYLVANIA WATER SYSTEM DISTRIBUTION REPLACEMENT PROJECT Sealed Bids for the construction of the Water System Distribution Replacement Project will be received online by the Houtzdale Municipal Authority. Separate Bids will be received online for the following contracts as follows: Contract No. 18-01: Waterline Construction, March 4, 2019 until 2:00 PM local time. Contract No. 18-02: Waterline Construction, March 4, 2019 until 2:00 PM local time. Contract No. 18-03: Waterline Construction, March 4, 2019 until 2:00 PM local time. Contract No. 18-04: Waterline Construction, March 18, 2019 until 2:00 PM local time. Contract No. 18-05: Waterline Construction, March 18, 2019 until 2:00 PM local time. Contract No. 18-06: Waterline Construction, April 1, 2019 until 2:00 PM local time. Contract No. 18-07: Waterline Construction, April 1, 2019 until 2:00 PM local time. Bids shall be on a unit price basis for all contracts, Contract No. 18-01 through Contract No. 18-07. The Project generally consists of replacing water distribution mains throughout the Authority's existing water service area. The project also generally includes water main appurtenances including but not limited to water valves, fire hydrants, interconnections, water service laterals, meters, and meter pits. The following narrative outlines each of the identified contracts and areas. Contract No. 18-01 is located within Houtzdale Borough, Woodward Township, and Brisbin Borough and consists of approximately 28,500 linear feet of waterline replacement. Contract No. 18-02 is located within Woodward Township and Brisbin Borough and consists of approximately 12,500 linear feet of waterline replacement. Contract No. 18-03 is located within Woodward Township and consists of approximately 18,500 linear feet of waterline replacement. Contract No. 18-04 is located within Woodward Township and Gulich Township and consists of approximately 29,000 linear feet of waterline replacement. Contract No. 18-05 is located within Gulich Township and Beccaria Township and consists of approximately 32,000 linear feet of waterline replacement. Contract No. 18-06 is located within Ramey Borough, Gulich Township, and Bigler Township and consists of approximately 12,500 linear feet of waterline replacement. Contract No. 18-07 is located within Woodward Township and Bigler Township and consists of approximately 40,000 linear feet of waterline replacement. The Issuing Office for the Bidding Documents is: Herbert, Rowland & Grubic, Inc. at 474 Windmere Drive, Suite 100, State College, PA 16801. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 9:00 A.M. until 4:00 P.M. Sealed bids shall be accepted online through the PennBID Program. Bidding Documents and solicitation details may be viewed and available at no cost online by registering at www.PennBID.net. Following registration, complete sets of Bidding Documents may be downloaded as portable document format (PDF) files. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidder's date of receipt of the Bidding Documents. Bid security in the form of a certified check or Bid Bond shall be furnished with the bid in an amount not less than 10%. All questions about the meaning or intent of the Bidding Documents are to be submitted via the PennBID Program in accordance with the Instructions to Bidders. Telephone inquiries are unacceptable. All bids shall be irrevocable for 60 days after the bid opening date unless award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case this Bid shall remain subject to acceptance for 120 days after the bid opening date as provided by the Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). Bidders must comply with all State antibid-rigging regulations pertaining to Work associated with this Project, and will be required to submit an executed non-collusion affidavit with the bid. The estimated cost for each Contract is greater than Two Thousand Dollars ($2,000) and the Federal Davis-Bacon Act shall apply. Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and preservation of public natural resources that affect the Project, said provisions being pursuant to Act No. 247 of the General Assembly of the Commonwealth of Pennsylvania, approved October 26, 1972. This Project falls under The Commonwealth of Pennsylvania enacted Act 127 of 2012, known as the Public Works Employment Verification Act ('the Act') which requires all public work contractors and subcontractors to utilize the Federal Government's E-Verify system to ensure that all employees performing work on public work projects are authorized to work in the United States. All Bidders are required to submit a Public Works Employment Verification Form as a precondition for the Contract Award. All bidders are hereby notified that in regard to any Contract pursuant to this advertisement, businesses will be afforded full opportunity to submit bids in response to this notice and will not be subjected to discrimination on the basis of gender, race, color, creed, sex, age, physical disability or national origin in consideration for an award. Similarly the Successful Bidder shall in no manner discriminate against or intimidate any employee involved in the manufacture of supplies, the performance of Work, or any other activity required under the Contract on account of gender, race, creed or color. The Houtzdale Municipal Authority reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Houtzdale Municipal Authority, and to reject any or all proposals. Bid Result Contract No. 18-01: Waterline Construction C&R Directional Boring, LLC - $2,936,112 Contract No. 18-02: Waterline Construction C&R Directional Boring, LLC - $976,858 Bid Result : Contract No. 18-06: Waterline Construction, April 1, 2019 until 2:00 PM local time. : S&E Utility Contracting Inc : $702,244 Contract No. 18-07: Waterline Construction, April 1, 2019 until 2:00 PM local time. : Diehl Contracting LLC : $1,987,411.00

Award

Water / Sewer

$2,689,655.00

Public - City

Site Work

442

2

15

9

Subscribe For Documents

135 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment, Play Field Equipment and Structures, Healthcare Equipment, Therapy Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Hangers and Supports for Fire-Suppression Piping and Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Geotextiles for Earthwork, Earth Moving, Grading, Rough Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Vibroflotation and Densification, Densification, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Public Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Common Work Results for Process Piping, Gas and Vapor Process Piping, Liquids Process Piping
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
45
Bidding Soon
509
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2019

April 3, 2019

img_map_placeholder

Multiple Locations, Houtzdale, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Water System Distribution Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.