BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Bakersfield, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Centennial Corridor Mainline Project proposes to extend State Route 58 (SR 58) from the current terminus as a freeway at State Route 99 (SR 99) to Westside Parkway. At the SR 58/SR 99 interchange, the Project proposes to add a collector distributor on the Northbound SR 99 and construct the NB to WB connector. The project also includes various local road improvements including realigning and cul-de-sacs along the corridor, widening and realignment of Chester Ave at SR 58, and construction of a traffic signal at the Eastbound SR 58 ramps/Brundage Lane intersection which is part of the SR 58/Cottonwood interchange. During the bidding of this project, contractors who have questions or desire clarifications about the bid documents, must submit those questions or requests for clarifications in writing using the form provided in the bid documents. Said questions and requests for clarifications must be submitted by the date identified in the project schedule in Section 4 of these Special Provisions. Construction is slated to commence July 2019 and will have a 3 year duration period.

Award

Roads / Highways

$147,013,656.00

Public - City

Paving, Site Work

2754

16

293

8

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
35
Active Projects
22
Bidding Soon
406
All Active Projects
164
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2019

July 22, 2019

img_map_placeholder

Multiple Locations, Bakersfield, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.