BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to an educational facility in Dallas, Texas. Completed plans call for the addition of a educational facility; and for the renovation of a educational facility.

As of June 26, 2019, all bids have been received. All trades have been let. Addition of a new school cafeteria and library space that connects the two existing buildings into one unified building. Phase 3: Storm Shelter addition, Classroom Renovation, CTE Renovation, & Locker Room Renovation. Instructions to Bidders and Bid Forms will be distributed by: June 14, 2019 Please Break Out your scope between the Storm Shelter, Class Room infill, CTE Renovation, Locker Room Renovation The Classroom Infill is located in sector 5 The storm shelter and CTE renovation is sector 3. with the storm shelter having its own set of drawings designated as shelter in the name The locker room renovation is sector 2. There are multiple alternates that have to do with MEP scopes of work. Alternates 4 and 6 are whole area alternates for the multi media area (alternate 6) and ARD area is (alternate 4) These will have breakout line items in the bid packages included in addendum A that we will issue a day after the pre-bid meeting. All Trades: Please note that this is "summer work" for the summer of 2020 and, depending on your scope of work, we may ask that you include the work on the renovations as 56 hour work weeks instead of the standard 40. Trades we currently plan to have a voluntary alternate for 56 hour work weeks on their bid packages are as follows. - Drywall - Painting - Flooring

Award

Educational

$16,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

222

30

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
66
Bidding Soon
3,546
All Active Projects
1,405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.