Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 29, 2019 at 8:00 PM
Updated January 6, 2026
Site work for a road / highway in Custer, South Dakota. Completed plans call for site work for a road / highway.
PH 0040(220) (PCN 04HW) County : Custer, Meade, Pennington Length Miles 7.070 Contract Id: 7796 DBE Goal: Not Specified Type of Work : Cold Applied Plastic Durable Pavement Marking Description of Location : Various locations on the State System in the Rapid City Region All bids will be checked for qualifications with results posted on the SDDOT website The Department of Transportation reserves the right to reject any or all bids. SDDOT - Item No - 09 - Cold Applied Plastic Pavement Marking Work on this project consists of Surface Preparation/Obliterating existing cold plastic and applying Cold Plastic Pavement Marking Tape on the following routes: 1. SD445 MRM 74.55 to MRM 76.60. Replace all existing cold plastic, except stop bars. Surface is PCCP. Boundaries are Asphalt/PCCP transition near MRM 76.70 to 100 south of Black Hill Energy approach (MRM 74.55). See layouts for 8 tape locations. 2. US14A - Asphalt/concrete transition near MRM 51.85 to MRM 53.03 (I90 WB Ramps intersection). Replace all Cold Plastic except 24" white tape. Surface is PCCP. Some edge line on west end is tape with paint on top of it-replace this with tape. Include arrows, ONLY's, and RRXs. For I90 EB off ramp, and I90 WB off ramp, replace all arrows (wrong way and regular arrows). 3. US16B - MRM 70.40 to MRM 72.77. All Cold Plastic white centerline skips. PCCP from I90 to SD 44. Contractor only allowed to work at night at this location, 8pm-6am. 4. US16A - MRM 22.5 to MRM 24.05. Replace all markings thru Custer with tape. Asphalt thru the City of Custer. Include all markings for 16/385 & 16A/89 intersection. See layout sheet for 16A/89. Include all crosswalks and stop bars along route Existing markings are paint. Groove depth is good. Include parking lane lines in downtown Custer. Do not replace white edge line on east end of project limits, it is to remain paint, see layout sheet. MRM 24.05 is box culvert over French Creek. 5. US16 - MRM 26.44 to MRM 26.94. Replace tape for all markings thru Custer. Asphalt thru the City of Custer. Exclude all markings for 16/385&16A/89 intersection. Include all crosswalks and stop bars along route Existing markings are paint. Groove depth is good. Include parking lane lines in downtown Custer. Include all markings for 16 & 385/89 intersection (3 stop bars, and all crosswalks). 6. SD34 - MRM 33.83 to MRM 34.23. All Cold Plastic from I90 WB Ramps intersection to 11th St. Asphalt/PCCP transition near 11th st is east end of segment. Replace all, arrows, skips, and neutral areas with crosshatching.
Award
Roads / Highways
$455,576.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2019
March 8, 2019
Multiple Locations, Custer, SD
Related To This Project
Custer, SD
Bid Date: Feb 09 2026
Custer, SD
Bid Date: Feb 24 2026
Custer, SD
Bid Date: May 21 2020
Custer, SD
Bid Date: Jan 05 2026
Custer, SD
--
Custer, SD
--
Custer, SD
--
Custer, SD
--
Custer, SD
Bid Date: Dec 03 2025
Custer, SD
Bid Date: Nov 24 2025
Custer, SD
Bid Date: Nov 20 2025
Custer, SD
Bid Date: Oct 23 2025
Custer, SD
Bid Date: Oct 21 2025
Custer, SD
Bid Date: Sep 27 2025
Custer, SD
Bid Date: Sep 18 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
