BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2019 at 8:00 PM

Updated October 24, 2023

Site work, paving and renovation of a bridge / tunnel in Providence, Rhode Island. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the renovation of a bridge / tunnel.

Counties of Kent, and Washington, City of Warwick and the Town of North Kingstown, Rhode Island, for Statewide Bridge Repairs Contract 4, The work under this contract shall consist of, but not be limited to, Steel Beam/Girder Repairs; Temporary Jacking and Shoring of Beams/Girders; Removal and Disposal of Portions of Existing Reinforced Concrete Superstructure and Substructure; Constructing New Reinforced Concrete Beam Seats, Deck Slabs, Backwalls,Approach Slabs, and Parapets; Repainting Existing Structural Steel: Bearing Replacement; Joint Replacement; Structural Concrete Masonry Repairs; Installation of Waterproofing Membrane; Installation and Removal of Temporary Shielding; Removal and Disposal of Existing Bituminous Pavement; Installation of New Bituminous Pavement; Striping; Seeding; Maintenance and Protection of Traffic; and all other incidentals necessary to complete the work under this Contract, The Contractor will be required. in avordance with the provisions of the Disadvantaged Business Enterprise Affirmative Action Certification for Contractors and Consultants, to meet the established Race-Conscious Goal, or Contract Coal, of not less than 10.00 percent of the contract bid price, to the Contractors, Subcontractors, and/or suppliers which qualify as Disadvantaged Business Enterprises (DBE's). Failure by the Contractor to demonstrate every good faith effort in fulfilling its DBE commitment during the construction period will result in the reduction in contract payments by the amount determined by multiplying the awarded contract value by the established DBE ercenta an s tractin th dollar 1 e of the work actually performed by DBE contractors. This action will not preclude RIDOT from imposing sanctions or other remedies available as specified in paragraph (I)(C) of the Disadvantaged Business Enterprise Affirmative Action Certification for Contractors and Consultants. RIDOT- Statewide Bridge Repairs, C-4

Award

Bridges / Tunnels

$6,297,732.00

Public - State/Provincial

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
637
Active Projects
357
Bidding Soon
4,500
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2019

April 15, 2019

Project location map

Multiple Locations, Providence, RI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.