Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 11, 2024 at 8:00 PM
Updated June 12, 2024
Renovation of a civil project in Austin, Texas. Design plans call for the renovation of a water / sewer project.
Construct a lift station dedicated to the Johnny Morris Interceptor, leaving the Raw Water Pump Station inside Walnut Creek Wastewater Treatment Plant for process flows and plant drains only. As of June 11, 2024, the construction manager and design firm has been selected. Further details regarding construction and completion timelines have not been released.
Design
Water / Sewer
$12,600,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 2, 2024
7113 FM 969, Austin, TX
Related To This Project
Austin, TX
Bid Date: Feb 09 2022
Austin, TX
--
Austin, TX
Bid Date: Nov 09 2021
Austin, TX
Bid Date: Aug 23 2018
Austin, TX
Bid Date: Jun 13 2019
Austin, TX
Bid Date: Nov 30 2021
Austin, TX
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
