BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 20, 2024 at 7:00 PM

Updated December 21, 2024

Site work and paving for a civil project in Austin, Texas. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

The Work consists of, but not limited to, furnishing all tools, labor, materials, equipment, and miscellaneous items necessary for the complete construction of approximately 9,400 linear feet of 36-inch nominal diameter HDPE wastewater force main from Boggy Creek Lift Station to the Lockheed Shaft of the Govalle Wastewater Diversion Tunnel by open cut, including approximately 1,600 linear feet of Horizontal Directional Drill (HDD) beneath the Colorado River and boring (road/utility crossings). The Work also includes installation of air release valves, isolation valves, construction of polymer concrete manhole with a Vortex Flow Insert (VFI), abandonment of existing wastewater lines, connection to existing manholes and existing force main, by-pass pumping, pavement restoration, site civil improvements, environmental protections, and all other appurtenances to provide a complete and operable system. All Bids shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Bid, as specified in Section 00100, Instructions to Bidders. Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Liquidated damages are six hundred eighty ($680.00) per Calendar Day for failure to achieve final completion within five hundred and forty-nine (549) Calendar Days, in accordance with the Bid Form, Section 00300. Project Related Questions: Kane Wei (512) 972-0074 kane.wei@austintexas.gov OWNER reserves the right to reject any or all Bids and to waive any minor informality in any Bid or solicitation procedure (a minor informality is one that does not affect the competitiveness of the Bid) WBE (0.93%)

Bid Results

Water / Sewer

$15,063,376.00

Public - City

Paving, Site Work

156

44

8

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
3
Bidding Soon
1,540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.