BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Indianapolis, Indiana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Range: $200,000 - $400,000 This Work will be funded by the City of Indianapolis. The participation goal for Minority Business Enterprise (MBE) for this contract is fifteen percent (15%). The participation goal for Women Business Enterprise (WBE) for this contract is eight percent (8%). The participation goal for Veteran Business Enterprise (VBE) is three percent (3%). The participation goal for Disability-owned Business Enterprise (DOBE) is one percent (1%). The purpose of this investigation is to determine the general near surface and subsurface conditions within the project areas and to develop the geotechnical engineering recommendations necessary for the design and construction of the pedestrian bridge and culvert. This was achieved by drilling three (3) soil borings and by conducting laboratory tests on samples taken from the borings. This report contains the results of our findings, an engineering interpretation of these results with respect to the available project information, and recommendations to aid in the design and construction of the proposed structures. The proposed project includes the construction of a new pedestrian bridge and culvert on a proposed walking path along South High School Road in Indianapolis, Indiana. We understand that the proposed pedestrian bridge will be pre-engineered and approximately 30 feet in length. We also understand that the proposed culvert will be a pre-cast concrete box culvert and approximately 12 feet by 4 feet in plan dimensions. No structural loading conditions were provided at the time that this report was prepared. We also understand that this report will not be reviewed by the Indiana Department of Transportation (INDOT). Please note that INDOT will require additional borings, sampling and testing, as well as engineering analysis per INDOT standards (which is beyond the scope of work authorized by the Client). Additional questions will be answered up until 12:00 p.m. on Thursday, February 7, 2019.

Award

Sidewalks / Parking Lot

$374,000.00

Public - State/Provincial

Paving, Site Work

28

3

73

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
34
Bidding Soon
728
All Active Projects
391
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2019

March 18, 2019

img_map_placeholder

Multiple Locations, Indianapolis, IN

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.