BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kissimmee, Florida. Completed plans call for the renovation of a educational facility.

Question End Date 2/11/2019 12:00 PM Poinciana High School HVAC Central Chiller Plant Replacement Project (Project). The selected firm will provide Construction Management Services for the complete replacement of the HVAC Chiller Plant at Poinciana High School. The Project's Scope of Work includes, but is not limited to the following: Construction of a new central chiller plant (CEP) on the northwest corner of the property. The plant will consist of four new nominal 250-ton premium efficiency chillers and one nominal 170-ton existing chiller that will be relocated from the existing plant at Building 12 to the new location. The plant will be provided with a new primary / secondary pumping system comprised of six primary pumps and two secondary pumps, each system with one fully redundant pump. All pumps are to be provided with new variable frequency drives. All of the required air control and hydronic specialties will be provided for the new plant as well as a new control system to be tied into the existing. The plant area will require the construction of a new concrete pad and the installation of a chain link enclosure. A new 2000-amp main distribution panel and new electrical service is being provided by Duke Energy. External harmonic mitigation has been included in the Scope of Work to address power factor issues with Duke Energy, which are related to the new non-linear loads on the new service. New chilled water distribution loops are to be provided throughout the existing campus to connect the new CEP to the existing buildings. Each point of connection from the existing chiller plants to the buildings are to be demolished. Isolation valves are being included at each point of connection to allow for phasing and flexibility of bringing the existing buildings on-line with the new plant. Building 3 is to be provided with a new independent service from the new chilled water loop in lieu of it being sub-fed from the existing piping from Building 4. In addition to connecting the existing chilled water systems, a new chilled water service is being routed to Building 8, which is to be converted from direct expansion equipment to chilled water as part of this Project. The parking and surrounding area around the new CEP is being adjusted to accommodate and maintain traffic flow and parking. The air handling unit and condensing unit serving the Building 8 are to be removed and replaced with a new chilled water air handling unit. The air handling unit is to be provided with new controls tied into the existing campus BAS. The air handling unit is to be controlled as a single zone VAV system utilizing the ECM motor on the AHU fans for speed control. Upon completion of the new CEP and connection of each building into the new chilled water loop, each existing chiller plant is to be demolished in their entirety. All equipment, piping, concrete pads, chain link enclosures are to be removed. Remove all electrical gear, wire and conduit back to the source and label the distribution panels as spare. Acoustiblok or equal sound deadening material is to be applied to the CEP's chain link fence enclosure.

Award

Educational

$2,603,500.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
69
Bidding Soon
1,514
All Active Projects
644
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2019

April 18, 2019

img_map_placeholder

2300 S Poinciana Blvd, Kissimmee, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.