Published March 8, 2019 at 7:00 PM

Updated February 20, 2025

Demolition, site work, renovation and addition to an educational facility in New Brighton, Minnesota. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

This Geotechnical Evaluation Report addresses the proposed design and construction of additions and site improvements to Irondale High School, located in New Brighton, Minnesota. The project will include the construction of an auditorium addition along the southeastern edge of the existing building and a district office space on the southwestern portion of the building. The construction of the auditorium addition will require temporary shoring consisting of tiebacks and a shotcrete wall with helical piers. The district office addition will require the use of lightweight geofoam along a portion of the existing wall to prevent overloading of the wall. There will also be a classroom addition on the west side of the existing building. The northern portion of the existing interior courtyard will also be partially filled in for another classroom addition. Finished floor elevations in the auditorium addition and district office addition will range from 898.5 to 907. Finished floor elevations in the western classroom addition will be 907. Finished floor elevations in the courtyard classroom addition will range from elevation 909 to 911. The existing pool will also be filled in as part of this project. Site work will include reconfiguring three site entrances from Long Lake Road, reconstruction of the south parking lot, reconstruction of the loading dock area, and construction of a new parking lot east of the existing tennis courts. A retaining wall will be constructed between the tennis courts and the new parking lot and another retaining wall will be constructed by the new loading dock. The height of those walls is anticipated to be up to 10 feet. Proposed stormwater improvements include an underground system beneath the southern parking lot, potentially below the new east parking lot and expansion of the existing stormwater basin in the eastern portion of the site. Stormwater improvements will have structure or system inverts within 10 feet of existing surface grades. Substantial Completion Jan 2021 Bid Results: #09-B, TILE: WTG Terrazzo, $480,810 #09-A, DRYWALL: RTL Construction, $989,669 #08-D, SPECIAL DOORS: American Door Works, $39,507 #07-K, JOINT SEALANTS: The Caulkers, $62,590 #08-F, ENTRANCES, STOREFRONT, & CURTAINWALL: Brin Contract Glazing, $684,675 #05-A, STRUCTURAL STEEL (MATERIAL ONLY): Construction Systems, Inc, $828,650 #04-A, MASONRY: Rice Lake Construction Group, $1,618,450 #03-B, STRUCTURAL AND ARCHITECTURAL PRECAST: Wells Concrete Products, $1,235,900 #03-A, CONCRETE: Axel H. Ohman, Inc, #2,555,000 #05-B, STRUCTURAL STEEL (ERECTION): Amerect, Inc, $529,850 #14-B, WHEELCHAIR LIFTS: Arrow Lift, $70,200 #32-A, ASPHALT PAVING: Northwest Asphalt, $485,480 #32-F, IRRIGATION, RETAINING WALLS, AND LANDSCAPE: Peterson Companies, Inc, $389,911 #21-A, FIRE SUPPRESSION: Viking Automatic Sprinkler, $417,000 #26-A, ELECTRICAL: Muska Electric Company, $2,632,000 #09-D, FLOORING: Grazzini Brothers & Company, $358,975 #12-B, AUDITORIUM SEATING: Davis Furniture Company, $113,725 #09-K, PAINTING AND WALL COVERING: Superior Painting & Decorating, $196,000 #09-C, CEILINGS AND ACOUSTICAL TREATMENT: Sonus Interiors, $292,500 #09-F, WOOD : Alpine Industries, $48,983 #11-B, THEATER RIGGING & STAGE CURTAINS: Gopher Stage Lighting, Inc, $481,585 #11-F, FOOD SERVICE: Culinex, $45,475 #11-C, Theatrical Lighting Controls & Fixtures: Norcostco, $302,260 #20-A, MECHANICAL : RJ Mechanical, $4,166,300 #31-A, SITE CLEARING AND EARTHWORK: Belair Builders, Inc, $2,541,366 #07-H, ROOFING: Diverse Construction Services, $825,000 #07-F, METAL PANELS: Specialty Systems, $487,000 #06-D, CASEWORK: Cosney Corporation, $224,915 #06-A, CARPENTRY: Schreiber Mulaney Construction, $1,884,890

Bid Results

Educational

$22,018,405.00

Public - City

Addition, Demolition, Renovation, Site Work

416

32

331

31

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
252
Active Projects
134
Bidding Soon
1,484
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2019

April 22, 2019

Project location map

2425 Long Lake Rd, New Brighton, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.