BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Opa Locka, Florida. Completed plans call for the renovation of a educational facility; for site work for a educational facility; and for paving for a educational facility.

J.R.T. Construction, Co. will receive sealed bids for MDCPS Project #01888500 -Miscellaneous Maintenance (FEMA) Repairs at Six Schools due to Hurricane Irma Damages for Maintenance Operations as listed below: This project is open to all subcontractors that are registered or would be able to register to do business with the school board of miami-dade county, florida. Project Names: 1. North Glade Elementary School - 5000 N.W. 177 Street, Opa-Locka, FL 33055 2. Brentwood Elementary School - 3101 N.W. 191 Street, Miami Gardens, FL 33056 3. Golden Glades Elementary School - 16520 N.W. 28 Avenue, Opa Locka, FL 33054 4. American Senior High School - 18350 N.W. 67 Avenue, Hialeah, FL 33015 5. Scott Lake Elementary - 1160 N.W. 175 Street, Miami, FL 33169 6. Dr. Michael Krop Senior High School - 1410 N.E. 215 Street, Miami, FL 33179 The project includes replacing existing sidewalks, replacing damaged acoustical ceiling tiles thru-out several areas of the school, removing and reinstalling electrical devices from acoustical ceiling tiles being replaced, removing and reinstalling sprinkler heads at ceiling tiles being replaced, replacing existing stage curtains, replacing existing damaged 20' x 20' playground shade cover on existing playground equipment, new traffic signage (including foundations), patching and painting of damaged drywall, replacing existing steel pipe at Roof top of Building, providing vent thru roof pipe caps at the rooftop of Building 1, chain link fencing repairs, replacing damaged light fixture lenses, replacing damaged doors with new doors and hardware, replacing damaged VCT Floor Tile, removing existing Wood Lattice Board from PE Shelter, new fire rated acoustical ceiling tile system, replace damaged light fixtures, replace damaged rubber playground surface with new synthetic turf with 2" padding, provide new surface mounted electric hand dryer, replacing damaged downspouts, scupper boxes, downspout couplings, replacement of damaged exhaust fans and sod restoration incidental to the scope of work.

Post-Bid

Educational

$300,000.00

Public - County

Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
50
Bidding Soon
1,100
All Active Projects
496
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2019

March 13, 2019

img_map_placeholder

Multiple Locations, Opa Locka, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.