BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 18, 2019 at 8:00 PM

Updated April 4, 2025

Site work for a mixed-use development in Vernon, Wisconsin. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

As of 04/18/2019 Awarded: Hastings Asphalt Service $41,458.00 Thunder Road LLC $5,288.00 As of 02/12/2019 The budget for the project is $45,000 to $55,000. 2019 Waukesha County Road and Parking Lot Crack Fill and Striping Project Multiple Waukesha County Facilities Waukesha County Project No. PLU19-03 1. Crack Filling -The Contractor's Work under this contract shall include all labor, materials, tools, equipment and related items necessary to install crack fill as shown on the drawings and as specified herein. This work includes cleaning, drying and filling the longitudinal and transverse cracks in asphaltic pavement. Crack filling shall take place prior to striping. Striping - The Contractor's Work under this contract shall consist of furnishing all labor, materials and equipment necessary for pavement striping and marking as herein specified and for the sections shown on attached drawings and as per S.W.S.S. 646. Striping of roads includes all pavement markings on designation section and may include: center lines, stop lines, direction arrows, parking lot stalls, accessible stall, hatching, curb markings and pavement lettering. Striping of parking lots includes all pavement markings on designation section and may include: stop lines, parking lot stalls, accessible stalls, hatching, curb markings and pavement lettering. All pavement marking shall comply with Waukesha County standard paving colors unless directed by the County Landscape Architect. Standard Colors: Parking Lot Stall Lines - white, Accessible Symbols - blue and white, Parking Lot Hatching - white, Directional Arrows - white, Pavement Lettering - white, Crosswalk Bar - reflective white paint, Center Lines - bright yellow, Curb Marking (no parking) - bright yellow, Trail Crossings Crosswalk Bar - white epoxy. A Pre-Bid meeting is not scheduled for this project. Bidders and sub-Bidders requiring clarification or interpretation of the Bid documents shall submit a written request to Danette Poquette at parksinfo @waukeshacounty.gov no later than 10:00 a.m. on Tuesday, February 12, 2019.

Award

Roads / Highways

$46,746.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
3
Bidding Soon
1,703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2019

May 1, 2019

Project location map

Multiple Locations, Vernon, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.