Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Johnston, Iowa. Working plans call for site work for a road / highway; and for paving for a road / highway.
https://www.cityofjohnston.com/DocumentCenter/View/8065/CIP_Public_Hearing_Complete_010421 Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25% Urbandale) SCHEDULING AND PROJECT STATUS; 18-19 Design 19-20 ROW Acquisition/Utility Relocation 20-21 Construction ($2,470,910 - Johnston, $1,116,775 - Urbandale) RELATIONSHIP TO COMPREHENSIVE PLAN AND OTHER PROJECTS: Consistent with Comprehensive Plan Project is included City of Johnston FY 2021-2025 Page 46 _______________________________________________________________________________________________________________________ https://www.cityofjohnston.com/DocumentCenter/View/8065/CIP_Public_Hearing_Complete_010421 Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25% Urbandale) SCHEDULING AND PROJECT STATUS; 18-19 Design 19-20 ROW Acquisition/Utility Relocation 20-21 Construction ($2,470,910 - Johnston, $1,116,775 - Urbandale) RELATIONSHIP TO COMPREHENSIVE PLAN AND OTHER PROJECTS: Consistent with Comprehensive Plan PID - # 21-Road-009 Project is included City of Johnston Falls FY 2021- 2026 CIP Page 46 _______________________________________________________________________________________________________________________ www.cityofjohnston.com/DocumentCenter/View/7609/Section-4---Capital-Improvement-Plan-CIP Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25%Urbandale) Project is included City of Johnston FY 2020/2021 -2023/2024 CIP Page 22 ___________________________________________________________________________________________________________________________________________________________________________ www.cityofjohnston.com/DocumentCenter/View/7609/Section-4---Capital-Improvement-Plan-CIP Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25%Urbandale) Project is included City of Johnston FY 2020/2021 -2023/2024 CIP Page 22 ________________________________________________________________________________________________________________________________ Reconstruct existing two lane rural to proposed urban design. This is a joint project with Urbandale includes reconstruction of the intersection and 500+/- feet of roadway. Traffic signal constructed at Joint project with Urbandale (Cost share approx. 75% Johnston and 25%Urbandale) Project is Included City of Johnston FY 2020/2021 -2024/2025 CIP. As of May 1, 2020, a design team and a general contractor have been selected. Construction is anticipated to begin in 2020. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of September 19, 2023, no new information available
Pre-Construction/Negotiated
Roads / Highways
$247,910.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 27, 2023
To Be Determined, Johnston, IA
Related To This Project
Johnston, IA
--
Johnston, IA
--
Johnston, IA
Bid Date: Sep 29 2022
Johnston, IA
Bid Date: Sep 14 2022
Johnston, IA
Bid Date: Aug 25 2022
Johnston, IA
Bid Date: Sep 14 2022
Johnston, IA
Bid Date: Sep 20 2022
Johnston, IA
Bid Date: Aug 25 2022
Johnston, IA
Bid Date: Jul 19 2023
Johnston, IA
Bid Date: Sep 20 2022
Johnston, IA
Bid Date: May 26 2022
Johnston, IA
Bid Date: Aug 25 2020
Johnston, IA
Bid Date: Sep 14 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.