BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Storm Lake, Iowa. Completed plans call for the renovation of a pre-engineered storage facility; and for site work for a water / sewer project.

Storm Lake Maintenance Garage Domestic Water Piping and Garage Ventilation System. The Project consists of the replacement of existing interior waterlines due to corrosion. This will include removal, disposal and replacement as per plans and specifications. The Project consists of the replacement of the existing exhaust system to remove moisture from space causing corrosion to water lines. This will include removal, disposal and replacement as per plans and specifications. Performance and Payment Bond (if required) If the contracted amount is $25,000 or more, the successful Bidder must furnish a performance bond covering the faithful performance of 100% of the Contract and the payment of all obligations arising thereunder. It is the responsibility of the Contractor to notify the surety company of the required amount of the bond. The surety is based on the percentage of the contractors total base bid and does not include any alternate costs. Contractors are to let surety companies know the 5% Surety amount is to be clearly identified on the Surety Companies documentation. The Iowa DOT reserves the right to accept or reject any or all responses and to waive irregularities or technicalities, provided such waiver does not substantially change the offer or provide a competitive advantage to any supplier(s) or provider. The Iowa DOT also reserves the right to accept that response which is deemed to be in the best interests of the state. Any unauthorized changes, additions, or conditional response including any ties to another response or any reservations about accepting an award or entering into a contract, may result in rejection of the response. Responses must remain available for award for thirty (30) days from opening date and time. Bidder Questions, Requests for Clarification, & Changes (no later than) February 15, 2019 Requests for Pre- bid Substitutions for Products or Materials (no later than) February 15, 2019 DOT Response to Questions Issued (no later than) February 21, 2019 DOT Response to Pre-bid Substitution Requests February 21, 2019 Announce Successful Bidder Intent to Award March 1, 2019 Completion of Contract Negotiations & Execution of the Contract March 15, 2019 IADOT - Storm Lake Maintenance Garage Domestic Water Piping and Garage Ventilation System

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$47,535.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
19
Bidding Soon
219
All Active Projects
124
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2019

April 15, 2019

img_map_placeholder

1301 W Milwaukee Ave, Storm Lake, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.