BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2019 at 8:00 PM

Updated April 3, 2025

Demolition, site work, renovation and addition to a water / sewer project in Bethlehem, Georgia. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of April 10, 2019, the project has not been awarded.** Progressive Design Build Services Tanner's Bridge WWTF Expansion to 1.0 MGD OWNER: Barrow County Board of Commissioners Barrow County, Georgia is seeking qualified firms to submit responses in the form of Statements of Qualifications with Cost Proposal (SOQP) indicating their interest and qualifications for the Progressive Design-Build Services for the design and construction of the Tanner's Bridge Wastewater Treatment Facility Expansion to 1.0 MGD (Project) in accordance with RFQP2019-19. All SOQPs will be evaluated and the project will be awarded, if it is awarded, within 60 days of the opening. Neither companies nor representatives or agents of companies shall contact any members or employees of the County Consultant, Barrow County Board of Commissioners, or any Barrow County Elected Official regarding this RFQP. All questions/inquiries are to be submitted in writing by email to the following and will be answered and posted as an Addendum on the Barrow County website. Cindy Clack, Senior Buyer Barrow County Board of Commissioners 30 North Broad Street Winder, GA 30680 E-Mail - cclack@barrowga.org Questions regarding this RFQP shall be received no later than 5:00 p.m. on Wednesday, March 13, 2019. The Proposal shall consist of a Technical Proposal, a Cost Proposal and all documents listed on the Required Submittal Checklist (Exhibit 1) of the RFQP. The Technical Proposal shall include Respondent's information, technical information, business-related information, and any Technical Proposal forms requested. The Cost Proposal shall include the Cost Proposal Forms and any information describing the basis for pricing and must be separately, sealed, marked and packaged. The required content of the Technical Proposal and Cost Proposal is further specified in the RFQP. Owner reserves the right to waive any informality or to reject fully or partially any or all SOQP's, to evaluate SOQP's, and to accept any SOQP which, in its opinion, may be in the best interest of the Owner. No bid will be rejected without just cause.

Award

Water / Sewer

$670,000.00

Public - City

Addition, Demolition, Renovation, Site Work

1

6

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
1
Bidding Soon
1,090
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2019

May 29, 2019

Project location map

1113 Briscoe Mill Rd, Bethlehem, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.