BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2019 at 8:00 PM

Updated April 22, 2025

Site work for a water / sewer project in Plainfield, Connecticut. Completed plans call for site work for a water / sewer project.

Well Cleaning and Redevelopment and Repair at Quinebaug Valley Trout Hatchery. Set-Aside : NO Qualified Partnership : NO The Contactor shall provide all labor, material, chemicals and equipment to satisfactorily clean and redevelop Well #7 at the Quinebaug Valley Trout Hatchery using the Aquafreed (liquid CO2) process or approved equal. Well #7 has a 50 Hp, 460 volt, 3 phase US motor that spins an American Marsh 11 HC 4 stage vertical turbine pump. It has a 16" diameter well casing with an 8" diameter column pipe and a 1 - 3/16" stainless steel shaft. It has a depth of 61' 9" and a screen length of 20'. The contractor shall conduct a video inspection of the well before and after reconditioning. The contractor shall also determine the specific capacity of the well before and after redevelopment. 1. Mobilize/demobilize injection and redevelopment equipment 2. Remove pumping equipment, reinstall pumping equipment, run pump performance test before and after well cleaning, disassemble pump, steam clean and inspect pump condition. Recommend well component repair or replacement if necessary. 3. Set up and tear down CO2 injection equipment 4. CO2 injection (two days of injections). 5. Set up and tear down Redevelopment equipment. Estimated 5 days on site from set up to tear down of equipment. 6. Redevelopment machine time - estimated 40 hours 7. Video inspection of the well casing and screening following removal of the pumping equipment and after cleaning is complete before installation of the pumping equipment and supply a DVD copy to the customer. 8. Specific capacity of the well in gallons per foot of drawdown shall be supplied to the customer pre and post cleaning. A written specific capacity report will be required.

Award

Water / Sewer

$40,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2019

March 22, 2019

Project location map

141 Trout Hatchery Rd, Plainfield, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.