Site work and paving for a sidewalk / parking lot in Muskogee, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

for 623-20-135 Replace & Upgrade Parking Lots 1 and 2 The contractor is to provide all labor, tools, materials, equipment, and supervision required remove all existing asphalt pavement surfaces in parking lot 1 and to also remove existing concrete surface in parking lot 2. Then, replace with new asphalt surface with minimum required base, or more, to both lots. The project shall include removal and replacement of all, curbs, concrete wheel stops, bollards, crosswalks, striping, signage, etc. All parking stalls shall have a standard width in coordination with Americans with Disabilities Act standards. All work must be done in compliance with applicable OSHA, EPA and federal/state environmental regulations and policies. Contractor is responsible for proper handling and disposal of debris, waste and any excess fuel generated during completion of this work. Location: Jack C. Montgomery VA Medical Center in Muskogee, OK Agenda: Introduction of Ilze Karklins-Powers CO and Jeremy Luther COR The pre-bid meeting/site walk is not mandatory QUESTIONS During site visit MUST BE WRITTEN DOWN Pertinent Dates: Questions are due by COB February 28, 2022. Any questions submitted after this time will not be reviewed or answered. Please submit to ilze.karklins-powers@va.gov Proposals due on March 15, 2022 no later than 1:00 PM MT. Submit to ilze.karklins-powers@va.gov. Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer. Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded. Confirmation of construction range is between $500,000 and $1,000,000. Bid Guarantee & Payment/Performance Bonds: are required. Please read the Instructions to Offerors section of the solicitation. There are several specific requirements that need to accompany your proposal past performance, OSHA/EMR rating and documentation required under VAAR clause 852.219-77 Limitation on Subcontracting. Contractor shall begin performance within 10 days after Notice to Proceed (NTP) and complete within 150 days. Post Award Compliance: Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice. The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less.

Post-Bid

Sidewalks / Parking Lot

$1,000,000.00

Public - Federal

Paving, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Shop Drawings, Product Data, and Samples, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Field Samples, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete, Concrete Curing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Derricks

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
73
Bidding Soon
814
All Active Projects
406
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2022

April 22, 2022

img_map_placeholder

1101 Honor Heights Dr, Muskogee, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace and Upgrade parking lots 1 and 2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.