BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2020 at 8:00 PM

Updated September 14, 2023

Renovation of a mixed-use development in Shawnee, Kansas. Completed plans call for the renovation of a educational facility.

The Work includes, but is not necessarily limited to the following: Broken Arrow, East Antioch, and Mill Creek Elementary Schools, Westridge Middle School, SM East, Horizons, and SW Northwest High Schools. The project consists gypsum board repair, new resinous floor and wainscot, new rubber flooring and base, rubber stair treads and landings, paint, pull and reinstall toilet partitions, relocate and new accessories, new toilet fixtures, new sink fixtures, new ceiling tiles, reinstalled/new lighting fixtures. The existing demolition includes gypsum board and tile wall and floor covering, carpet tile, VCT and base, rubber treads and risers, ceiling tile.

Under Construction

Educational

$1,181,000.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
89
Bidding Soon
1,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2020

May 1, 2020

Project location map

Multiple Locations, Shawnee, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.