EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2022 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a civil project in Belle Vernon, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; bridge / tunnel; and water / sewer project.

The description and location of the project is as follows: Widening and reconstruction of Interstate 70 along with reconstruction of the PA 51 Interchange (Exit 46) to eliminate the substandard cloverleaf interchange and replace it with a Diverging Diamond Interchange. To accommodate new interchange, project limits on PA51 are 1.5 miles in length with approximately one (1) mile involving reconstruction and widening. Project involves several intersecting roads including the relocation of Finley Road (Township Road) to form plus intersection with PA 981 and construction of three (3) cul de sacs. Project includes work to rehabilitate or replace eight (8) different structures, two of which are railroad owned structures. Structure work consists of replacement of bridge on PA 51 over I-70 with dual structures, replacement of Wheeling and Lake Erie railroad bridge over PA 51, rehabilitation and full painting of Smithton High Level Bridge, and other work to extend and rehabilitate other smaller structures within the project, including the Cedarbrook Golf Course Tunnel. Project requires coordination with both Wheeling and Lake Erie and CSX railroads and includes a design build traffic control plan with detailed conceptual plan provided. Additionally, the project will include nine (9) stormwater management basins, use of column supported embankments, steepened rock slope construction, incorporated sewer line construction, traffic signals, new interchange signing including overhead sign structures, pavement markings, guide rail, drainage, highway lighting, ITS relocation work, channel relocation, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 70, SECTION E10, in WESTMORELAND COUNTY ROSTRAVER TOWNSHIP from approximately one (1) mile west of PA 51 at segment 0450/0451 offset 1381 to just east of Smithton High Level Bridge at segment 0480/0481 offset 0751 EB/0729 WB. Project Cost Range: $100,000,000.00 - $124,999,999.99 Federal Project Status: Federal Oversight Structure Work: 21.00% Let Type: Scheduled Pre-Bid Meeting: Mandatory Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Highway Reconstruction 408 Version: 2020-4 All inquiries must be submitted electronically to ECMS, Do not contact the owner or engineer contacts. PennDOT - I-70 at PA 51 Interchange *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SR/SEC/Group ID: 70/E10/I-70 @ PA 51 Interchange Order No. 288-94

Award

Bridges / Tunnels

$120,661,977.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

2003

9

23

4

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Field Samples, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Temporary Runarounds, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Surveying, Protection of Adjacent Construction, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Post-Tensioned Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Corrosion-Resistant Masonry, Vitrified Clay Liner Plate
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Roadway Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Bored Piles, Drilled Caissons, Caissons
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Lifting Devices, Lifts
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
113
Bidding Soon
877
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2022

June 13, 2022

img_map_placeholder

PA-51, Belle Vernon, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

I-70 at PA 51 Interchange

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.