Renovation of an educational facility in Holmdel, New Jersey. Completed plans call for the renovation of a educational facility.

EEG Project No. 1269 S&H JOB #1872A Job No. 31180225 Renovations / Alterations At Multiple Schools Village Elementary 67 Mccampbell Road Holmdel Nj 07733 Indian Mill Elementary 735 Holmdel Road Holmdel Nj 07733 For Holmdel Board Oe Education 65 Mccampbell Road Holmdel Nj 07733 Neither the Own-er, nor the Architect will assume any responsibility for Bids mailed or misdirected in delivery. No bid may be withdrawn for a period of sixty (60) days from the opening of the bids. The Owner reserves the right to reject any or all bids and waive any informality in the bidding process in accordance with the law, if it is in the best interest of the Owner. The Contract, if awarded, shall be awarded to the lowest responsible bidder whose bid is responsive in all material respects to the bid re-quirements. No bid shall be deemed accepted until the adoption of a formal resolution by the Owner. All Bidders should contact the Architect's Office at (609) 695-7400 to confirm details of availability of Bidding Documents. All bidders must use and complete all bid forms provided in the manner designated, and must comply with every requirement contained in the instructions and specifications. Bids shall be marked in a sealed envelope with the name of the project plainly marked on the front of the envelope and accompa-nied by a bid guarantee in the form of a Certified Check, Cashier's Check, or Bid Bond in the amount of Ten Percent 10% of the bid, but not in excess of $20,000. The Bidder shall be classified by the New Jersey Department of the Treasury, Division of Property Management and Construction in the following trade C008 General Construction or C009 General Construction/Alterations and Additions Subcontractors named in the Form of Bid Proposal for Structural Steel, Plumbing, Heating Ventilating and Air Conditioning, and Electric, who perform any work on the Project must be prequalified prior to the submission of bids, pursuant to the State of New Jersey Division of Property Management and Con-struction DPMC. Bidders are required to comply with requirements of N.J.S.A. 10:5-1 et seq., "The Law Against Dis-crimination" and affirmative action, N.J.S.A. 10:5-31 et seq. and N.J.AC. 17:27-1 et seq. All bidders and their subcontractors shall be registered with the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48 et seq. All bids must be accompanied by a Certificate issued by the New Jersey Department of Labor and Workforce Development, pursuant to the Public Works Contractor Registration Act to the Bidder and all subcontractors. Pursuant to P.L. 2009, c.315 and/or N.J.S.A. 52:32-44 Business Registration of Public Contractors, all bids should include a New Jersey Business Registration Certificate issued by the New Jersey Depart-ment of Treasury, Division of Revenue of the Bidder and must include that of all subcontractors i.e., "named subcontractors", whose prices are included in the Contractor's bid. If not included with the bid, these documents must be submitted prior to award.

Post-Bid

Educational

$848,000.00

Public - City

Renovation

106

33

25

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Unit Prices, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Roof Tiles, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Tackboards, Signage, Interior Specialties, Partitions, Storage Specialties, Storage Assemblies
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Other Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping, Fire Suppression Systems Insulation
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Cables, Low-Voltage Electrical Power Conductors and Cables, Control-Voltage Electrical Power Cables, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Stripping and Stockpiling, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Athletic Surfacing, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations, Utility Transformers
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation

Find More Local Projects

Within 75 Miles of This Project
480
Active Projects
301
Bidding Soon
5,118
All Active Projects
2,080
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2019

June 14, 2019

img_map_placeholder

Multiple Locations, Holmdel, NJ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovations / Alterations at Multiple Schools

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.