BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a conference / convention center in Atlanta, Georgia. Completed plans call for the renovation of a conference / convention center.

** As of April 23,2019, this project has not yet been awarded. A timeline for award has not yet been established Furnish and install new brand and color specific acoustic cover material on the existing wall panels throughout the entire GICC International Salon. This installation also includes a) the existing wall panels b) the 12 x 12 feet double service doors c) the moveable wall storage door panel trim. The Owner shall select the color and pattern ofthe covering material. Two (2) colors combinations will be installed in the same pattern as the existing material. The GICC is a high uptime facility and the work shall be scheduled so it will not impact business. The following shall be included, but not limited to the completion of the project to the satisfaction of the owner: 1. Project to include all materials and labor for installation. 2. All existing wall acoustic panels, Service Doors, and Movable Wall Pocket Door trim included. 3. All Delivery, Freight, Storage, and Handling included. 4. Furnish all materials, supplies, tools, and equipment necessary for installation. 5. Professional preparation and installation procedures shall be adhered to. 6. 432 Fabrictrac wall panels, 4 x 5 feet. 24 wall storage panels trim, 1 x 5 feet. 1 double service door, 12 x 12 feet are to be covered. 7. Covering materials shall be Carnegie Fabrics Xorel Nexus #6425 backed for acoustic panels. Two equal quantity colors to be selected by owner. 10% attic overstock shall be supplied to owner. 8. Work to be completed in stages as directed by GICC representatives, no unfinished panels to be left after each stage. Work to be completed to the satisfaction of the GICC representatives. 9. All panel hardware to be removed and reinstalled as necessary. 10. Disposal of the old materials to be included. 11. Jobsite to be cleaned daily and panels to be cleaned after installation is completed. 12. Provide a full 24-month warranty on material, labor, and workmanship Bid Results Install regular hours Bezalel, Inc $78,850.00 Install after hours Bezalel, Inc $83,000.00

Award

Conference / Convention Centers

$83,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
89
Bidding Soon
1,508
All Active Projects
645
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2019

April 18, 2019

img_map_placeholder

2000 Convention Center Concourse, Atlanta, GA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.