Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fox Point, Wisconsin. Completed plans call for site work for a water / sewer project.
For the furnishing of all materials and the performance of the work as described below, in accordance with the Contract Documents (CD). The work associated with storm water drainage improvement in Vicinity of East Green Tree Road & North Lake Drive includes the following estimated quantities: Base Bid: Removal approximately 140 feet of existing deteriorated Lannon stone retaining wall Cast-in-place of new reinforced concrete retaining wall with pipe underdrain Medium Rip-Rap of approximately 160 TON Landscaping restoration within the project limits - approximately 800 SY Inquiries about the project should be directed to Yuriy Amelyan at Kapur & Associates, Inc. (414-751-7285). Each bid proposal must be submitted on the bid/proposal form provided in the CD and shall be enclosed in a sealed envelope addressed to the Village of Fox Point and marked "Bid" with the project name. Bidders should pay particular attention to the requirements for Bid signatures, as set forth in paragraph 06 of the Instructions to Bidders. As a part of their Bid, Bidders shall submit a full and complete list of: 1) all of the proposed Subcontractors and 2) the class of work which each will perform. Failure to include the Subcontractor list will be cause for rejection of a Bid. The selected Contractor shall not alter this list without the written consent of the Director of Public Works. A Contractor's Qualification Statement is also required and should be submitted with the Bid if not previously submitted. The CDs require that the selected Contractor furnish a Certificate of Insurance and Payment and Performance Bonds issued in the amount of the bid. Anticipated award date is March 12, 2019. The selected Contractor may begin work only after the Village has issued him a Notice to Proceed. The anticipated project start date is June 15, 2019. The selected Contractor must complete all work Not Later Than 90 days after the date of issuance of the Notice to Proceed. Only those bids that are accompanied by a Bid Bond or unqualified certified check in an amount not less than five percent (5%) of the bid will be considered. The Bid Bond or certified check serves as a guarantee that if the bid is accepted, the bidder will execute and file the Agreement and a 100% Performance Bond and Payment Bond within fifteen (15) days after the Notice of Award. In case the bidder fails to file such contract and bond within the time set forth, the certified check or Bid Bond shall be forfeited as liquidated damages. The contract letting shall be subject to the provisions of the Wisconsin Statutes, including Section 61.55, 61.56, 62.15, 66.0901, 66.0903, 779.14 and 779.16. No bid shall be withdrawn for a period one hundred twenty (120) days after the bid opening date without the consent of the Village of Fox Point. The Village of Fox Point reserves the right to reject any or all bids, to accept any bid most advantageous to it, or waive any technicality.
Award
Water / Sewer
$189,998.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 7, 2019
June 18, 2019
E Green Tree Rd & N Lake Dr, Fox Point, WI
Related To This Project
Fox Point, WI
Bid Date: Feb 05 2019
Fox Point, WI
Bid Date: Feb 05 2019
Fox Point, WI
Bid Date: Mar 22 2022
Fox Point, WI
Bid Date: Apr 05 2022
Fox Point, WI
Bid Date: Mar 31 2022
Fox Point, WI
Bid Date: Jun 07 2022
Fox Point, WI
Bid Date: Jun 07 2022
Fox Point, WI
Bid Date: Feb 06 2023
Fox Point, WI
Bid Date: Feb 04 2020
Fox Point, WI
Bid Date: Mar 26 2020
Fox Point, WI
Bid Date: May 28 2020
Fox Point, WI
Bid Date: Apr 30 2020
Fox Point, WI
Bid Date: Dec 06 2022
Fox Point, WI
Bid Date: Jul 28 2022
Fox Point, WI
Bid Date: Nov 15 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.