BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

As of April 28, 2021, a general contractor has been awarded. Construction is slated to commence May 2021. The NCPWF will be constructed north of Eastgate Mall across from the existing NCWRP. The completed facility will provide the owner with a production capacity of 34 million gallons per day of purified water that will be conveyed to Miramar Reservoir for augmentation. The NCPWF includes, but is not limited to, Operation and Maintenance Building, process facilities including ozone, biological active carbon (BAC) filters, membrane filtration (MF), including Pre-Selected System per Supplemental Volume A of Technical Specifications, reverse osmosis (RO), ultraviolet (UV) advanced oxidation, including Pre-Selected System per Supplemental Volume B of Technical Specification, support systems including chemicals, HVAC, electrical, instrumentation & control, and site work, all in accordance with the special provisions, drawings, and technical specification. The Project has specific milestones, constraints, testing periods, and completion requirements. o There are forms required by all Subcontractors, Suppliers, and Manufacturers; these forms can be found under 4. Required Forms o There is a PLA for this project--a copy can be found in Attachment I of the Specs. o There is an OCIP on this project--information can be found under 3. Reference Documents/OCIP. Addendum A-H have been issued.

Award

Water / Sewer

$356,681,930.00

Public - City

Site Work

1999

129

93

12

Subscribe For Documents

625 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
48
Bidding Soon
1,234
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2020

May 3, 2021

img_map_placeholder

4949 Eastgate Mall, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.