Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 10, 2022 at 8:00 PM

Updated September 15, 2023

Site work for a road / highway in Poplar Bluff, Missouri. Completed plans call for site work for a road / highway.

(1): Job J9M0276 Route BUS 67 Butler County. Conduit installation from Route W on BU 67 to BU 60, the total length of improvement being 2.552 miles. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid Range: $100K to $250K MODOT- H02 - Conduit Installation Notice to Proceed: July 6, 2020 Completion Date: Oct. 1, 2020 Liquidity Damages $250 per calendar days.

Award

Roads / Highways

$204,280.00

Public - State/Provincial

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
28
Bidding Soon
520
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2020

July 6, 2020

Project location map

US-67, Poplar Bluff, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed