Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Compton, California. Design plans call for the renovation of a educational facility.
On April 18, 2023, the Compton Community College District Facilities Bond Program Schedule included the information below. As of April 1 2024, this project is a few years out, and design will continue for at least a year. There has been no firm bidding or construction timeline established. Vo-Tech Building Renovation (Project Budget $12,819,525.00) Scope of work for this project includes relocation of the existing Cosmetology program from its current location in Tartar Village into the Vo-Tech Building; expansion of the space for the HVAC program; demo of some existing interior walls and reworking of existing interior space with new walls; new paint, ceilings, flooring, doors, windows; upgrade door hardware/keying to ASSA Abloy; upgrade lighting, power and low voltage systems; complete renovation of existing heating and air conditioning system; ADA upgrade to existing restrooms; roofing repair/replacement; and replacement of existing storefront, and exterior doors and skylight in atrium area. ARCH RFQ/RFP: 9/10/18- 4/4/19 Evaluate & Award AOR Contract: 4/5/19- 10/31/19 Plans & Specifications: 5/9/2023- 7/31/2023 Permits & DSA Approval: 8/1/2023- 5/6/2024 Bidding & Award: 5/7/2024- 9/9/2024 Construction: 9/10/2024- 7/16/2025 MIS Building Renovation (Project Budget $3,000,000.00) This project includes demo of some existing interior walls and reworking of existing interior space with new walls; new paint, flooring, doors; upgrades to lighting, power and low voltage systems; complete renovation of existing heating, ventilating and air conditioning system; upgrade door hardware/keying to ASSA Abloy; ADA upgrade to existing restroom and anything else necessary to accommodate additional personnel and relocation of the Print Shop to this building. The area to be remodeled is approximately 7,500 square feet. The original construction of this MIS Building was done as part of the A#03-69120 Math Science Building Project on campus. That project is currently uncertified due to lack of deferred approval for the Math Science Building’s curtain walls, metal panel soffit, store front and observatory dome. The district has met with DSA Los Angeles and received direction that when the plans for the MIS Building renovation are being developed, the District should also provide and submit concurrently with the MIS Building Renovation plans, through the Architect, as-built drawings for the deferred approval items still outstanding at the Math Science Building. The DSA–LA office will review those as-built drawings to determine if they are sufficient to approve and certify the original uncertified project. If not, they have indicated that at that time they will determine if they are willing to separate the MIS Building portion of the work out of the original A number for provisional certification. Based on this DSA requirement, in addition to design for the renovation in the MIS Building, the response to this RFQ for this project should include costs for preparing and submitting to DSA the as-built drawings for the deferred approval of the curtain walls, metal panel soffit, store front and observatory dome of the existing Math Science Building. Original DSA approved drawings and specifications for the project along with all other documentation the District has for the original construction of the Math Science Building A#03-69120 will be made available to the Architect awarded this contract. Plans & Specifications: 1/13/2025- 10/16/2026 Permits & DSA Approval: 10/19/2026- 4/30/2027 Bidding & Award: 5/3/2027- 8/13/2027 Construction: 8/16/2027- 2/4/2028 Math-Science Building Renovation (Project Budget $8,397,825.00) Scope of work includes any remedial work required by DSA if not certified through as-built drawings for deferred submittal items outstanding on A #03-69120, remodel of old Cosmetology buildings located in Tartar Village to convert into science labs during construction; demo of some existing interior walls and reworking of existing interior space with new walls; new paint, ceilings, flooring, doors, windows; upgrade door hardware/keying to ASSA Abloy; upgrade lighting, power and low voltage systems; complete renovation of existing heating and air conditioning system; replacement of existing storefront and exterior doors, ADA upgrade to existing restrooms and new cabinets and counters ARCH RFQ/RFP: 9/10/18- 4/4/19 Evaluate & Award AOR Contract: 4/5/19- 5/21/19 Plans & Specs: 1/13/2025- 6/5/2026 Permits & DSA Approval: 6/8/2026- 2/5/2027 Bidding & Award: 2/8/2027- 6/11/2027 Construction: 6/14/2027- 3/17/2028 Abel Sykes C D C Building Renovation (Project Budget $3,000,000.00) Scope of work includes new paint, ceilings, flooring, doors, windows; upgrade door hardware/keying to ASSA Abloy; upgrade lighting, power and low voltage systems; complete upgrade of existing heating and air conditioning system; roofing and ADA upgrade to existing restrooms. Budgeted for FY2026-2027 Sun Shelters for picnic tables at various locations on campus, Project Budget TBD Additional information will be provided as soon as more specific scope and budget has been identified. *The closed solicitation has been included below for reference: This RFQ is a part of the process for the District's selection and retention of an architectural services firm to provide architectural and related professional services for design, bidding and construction of the Projects. The scope of architectural services and other requirements for completing the architectural services for the Projects are described in this RFQ and in the Architectural Services Agreement included with this RFQ. Timely submitted RFQ Responses will be evaluated by a Selection Committee established by the District to ascertain the Respondents' respective qualifications, based on the criteria established in this RFQ. Following the Selection Committee's determination of which Respondents meet or exceed the qualifications standards set forth in this RFQ, in the sole and exclusive discretion of the Selection Committee, qualified Respondents may be requested to participate in an interview with the Selection Committee as part of the process for selection of an architectural services firm. The Projects: The scope of work includes design for renovation of multiple existing buildings on campus including the following list: 1. MIS Building Renovation; Project Budget $3,000,000.00 2. Vo-Tech Building Renovation; Project Budget $12,819,525.00 3. Abel Sykes C D C Building Renovation; Project Budget $3,000,000.00 4. Math-Science Building Renovation, Project Budget $8,397,825.00 5. Sun Shelters for picnic tables at various locations on campus, Project Budget TBD Obtaining the RFQ, all questions about the RFQ, requests for clarification of RFQ requirements and other communications relating to this RFQ shall be directed to the District contact person ("District Contact") set forth below. All communications to the District relating to this RFQ shall be submitted via email to the address below. Respondents and their respective employees, officers, agents or representatives shall communicate only with the District Contact relating to this RFQ. Any actual or attempted communication in violation of the foregoing will result in rejection of the Respondent's RFQ Response. Linda Owens Chief Facilities Officer Compton Community College District 1111 East Artesia Boulevard Compton, California 90221 lowens@compton.edu Latest Date/Time for Respondents to Submit Questions about or Request Clarifications of RFQ Requirements 2:00 P.M. 3/14/19 Responses to Requests for Clarification issued 3/19/19 by 5:00 PM The District expressly reserves the right to modify any portion of this RFQ prior to the latest date/time for submission of RFQ Responses, including without limitation, the cancellation of this RFQ.
Design
Educational
$28,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 29, 2025
1111 E Artesia Blvd, Compton, CA
Related To This Project
Compton, CA
Bid Date: Nov 13 2018
Compton, CA
--
Compton, CA
--
Compton, CA
Bid Date: May 18 2021
Compton, CA
Bid Date: May 25 2022
Compton, CA
Bid Date: Mar 02 2023
Compton, CA
Bid Date: Feb 28 2023
Compton, CA
Bid Date: Feb 08 2022
Compton, CA
Bid Date: Aug 25 2022
Compton, CA
Bid Date: Jun 16 2021
Compton, CA
Bid Date: Jul 26 2022
Compton, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.