Site work and new construction of an educational facility in Verbena, Alabama. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Proposal "C": A New P E Building at Verbena High School, # 19-120 Furnishing and installation of Earthwork & Concrete floor and foundations, moisture barrier and all slab and foundation reinforcing and the installation of anchor bolts for the Metal Building, and for the furnishing and installation of the Pre-Engineered Metal Building and all exterior materials indicated for a complete dried in structure and for the furnishing and installation of all sanitary sewer and water piping in slab and thru the roof All General Contractors bidding this project shall be required to visit the site and examine all existing conditions prior to submitting their proposal. All Bidders shall have general liability and workman's compensation insurance. The projects shall be bid excluding taxes. Bids must be submitted on separate proposal form furnished by the Architect or copies thereof. No bid may be withdrawn after scheduled closing for receipt of bids for a period of sixty (60) days. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owners judgment, the best interests of the Owner will thereby be promoted. If the Proposal is under $50,000.00 dollars, a Contractors license is not required, nor Performance, Statutory Labor and Material Payment Bonds. A separate certified check or Bid Bond payable to the Chilton County Board of Education in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidder's proposal if over $50,000.00 dollars. Proposal "C": All work to be completed in (150) calendar days. Performance and statutory labor and material payment bonds will be required at the signing of the Contract. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect.

Post-Bid

Educational

$1,000,000.00

Public - County

New Construction, Site Work

16

19

7

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
32
Bidding Soon
558
All Active Projects
231
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 4, 2019

August 5, 2019

img_map_placeholder

202 Co Rd 510, Verbena, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.