BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 3, 2019 at 8:00 PM

Updated November 14, 2023

Site work and renovation of a civil project in Madison, Wisconsin. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Effective January 1, 2014, all potential bidders must be certified by DOA prior to submitting bids on state construction projects over $50,000. All bids received from contractors who are not certified will be rejected This project is being let using a new single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. In general, the work consists of the replacement of the sanitary sewer lift station and force main at the Laboratory of Limnology building, including demolition of the existing pump equipment, providing new pumps, controls, and electrical service, abandonment and replacement of the force main, replacement of the water service, reconnecting the sanitary sewer and water service laterals to the Water Science & Engineering Laboratory building, surface restoration, and related items. The project also includes replacement of two street lights and associated bases and wiring. Base Bids will be received as a single lump sum bid for 3) Plumbing; and 5) Electrical The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23,2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23,2017. This change does not affect the Federal Davis Bacon Act requirements. Bid Result: PLUMBING: Hooper Corporation $72,844 ELECTRICAL: Forward Electric, Inc. $28,492

Award

Water / Sewer

$101,336.00

Public - State/Provincial

Renovation, Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
181
Bidding Soon
1,597
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2019

April 25, 2019

Project location map

680 N Park St, Madison, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.