Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 21, 2019 at 8:00 PM

Updated July 22, 2026

Site work and paving for a mixed-use development in Ashwaubenon, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; and road / highway.

The work shall consist of construction of construction of street, sewer, and water improvements to extend Element Way from the existing east terminus of Element Way to the south to connect with Marvelle Lane along with the following areas of sidewalk construction: Marvelle Lane (Oneida Street to Holmgren Way): approximately 7,060 square feet of 5 foot concrete sidewalk. Waube Lane (S. Ridge Road to Allied Street): approximately 6,700 square feet of 5 foot concrete sidewalk.

Bid Results

Roads / Highways

$573,110.00

Public - City

Paving, Site Work

20

22

8

7

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
33
Bidding Soon
638
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2019

April 17, 2019

Project location map

Multiple Locations, Ashwaubenon, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed