BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Corpus Christi, Texas. Design plans call for the renovation of a water / sewer project.

Construction of new headworks and lift station at Oso Water Reclamation Plant (WRP) started in FY18. The next phase of work involves secondary treatment improvements and a process conversion to Biological Nutrient Removal (BNR). This will allow the City to decommission current breakpoint chlorination (BPC) system which is currently achieving ammonia removal by chemical addition and will allow plant to maintain permit compliance by removing ammonia more efficiently and safely through biological processes. In addition, equipment associated with secondary treatment units have exceeded original design life and have become maintenance intensive and a hindrance to operations. Scope of improvements include constructing a new 6 MGD train, retrofitting existing aeration basins with fine bubble aeration equipment, construction of new blower building, replacement or rehabilitation of existing scum and sludge removal components on secondary clarifiers, improvements to chlorine contact chambers to address short circuiting, demolition/decommissioning of breakpoint chlorination system, upgrades in the existing belt press building, and other miscellaneous enhancements associated with administrative building, digesters and access roads. This project is included in the city's 2023-2025 Capital Improvement Plan (CIP). As of February 13, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Water / Sewer

$12,616,727.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
13
Bidding Soon
194
All Active Projects
79
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 7, 2024

img_map_placeholder

13409 Whitecap Blvd, Corpus Christi, TX


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.