BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Grover Beach, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

**As of 3/11/2021 project was already awarded $382,427.50. In general, the Base Bid Work shall be improvements within and approaching the Grand Avenue intersection with Oak Park Boulevard, including and not necessarily limited to, project management and controls activities, mobilization activities, public notification and interaction activities, construction surveying and staking, traffic control, protection of pavement surface features (water utility boxes and valves, and sewer manholes), removal of existing asphaltic concrete pavement and subgrade, roadway preparation, hot mix asphalt over compacted FDR cement repaving street surface and conform areas, signage, installation of pavement striping and markings, and traffic signal system modifications. Due to the high volume of traffic during the day, the City prefers that construction activities be completed at night; however, the City will consider allowing work during regular business days and hours provided contractor plan the work to minimize the inconvenience (7:00 a.m. to 5:00 p.m.). All night work activities shall be completed between 8:00 p.m. and 6:00 a.m. Sunday-Thursday. The night work will be a bid alternate. Each bid shall be accompanied by cash, certified or cashier's check, or bidder's bond for not less than ten percent (10%) of the amount of the base bid, made payable to the City of Grover Beach. The estimated opinion of probable construction cost for this Base Bid Work is $355,000. Inquiries or questions based on alleged patent ambiguity of the plans, specifications or estimate must be communicated as a bidder inquiry prior to bid opening. Bidder's inquiries shall be submitted in writing via e-mail to the City of Grover Beach, Public Works Department, at: PublicWorks@groverbeach.org. The cutoff time that the City will accept bidder's inquiries is 5:00 p.m. on the fifth business day prior to the bid opening date 2283 The estimated opinion of probable construction cost for this Base Bid Work is $355,000.

Award

Roads / Highways

$382,428.00

Public - City

Paving, Site Work

13

1

19

8

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
14
Bidding Soon
261
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2021

March 19, 2021

img_map_placeholder

Multiple Locations, Grover Beach, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.