Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 2, 2019 at 8:00 PM

Updated November 14, 2026

Renovation of an educational facility in Iowa City, Iowa. Completed plans call for the renovation of a 1,250-square-foot educational facility.

The project consists of, but is not limited to Classrooms 301 at Van Allen Hall of approximately 1,230 square feet; including; demolition, CMU masonry walls, hollow metal frames with wood doors, acoustical ceiling, light gage framing with gypsum board walls, carpet flooring, LVT flooring and ceramic tile, signage, plumbing demolition, restroom renovation, HVAC systems, and access control. Questions regarding the scope of work should be directed to Kent Lutz of CMBA Architects, (515) 244-2111. Substantial Completion Date: August 2, 2019 Bids will be received for a single General Construction Contract Iowa Construction Sales Tax Exemption Certificates will be provided on this project. No deposit is required. Bidders are asked to return the complete set of Bidding Documents to the above address within fifteen (15) days after opening of bids. Bid shall be accompanied by bid security, as set forth in the Instructions to Bidders. Bid security shall be agreed upon as the measure of liquidated damages which the Owner will sustain by failure, neglect, or refusal of bidder to deliver a signed contract stipulating performance of the Work in unqualified compliance with the Contract Documents. Successful bidder will be required to furnish a 100% Contract Performance and Payment Bond within ten (10) days after receipt of Notice of Award. No bid may be withdrawn for a period of forty-five (45) calendar days after the date of opening. The Board of Regents, State of Iowa seeks to provide opportunities for Targeted Small Businesses in accordance with the provisions of Chapter 73 of the Code of Iowa. This project has a participation goal of 10% for certified Targeted Small Businesses as specified in the Project Requirements. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa. The Board of Regents, State of Iowa reserves the right to reject any and all bids, to waive irregularities, and to accept that bid which is deemed in the best interest of the Owner. Project Information: Substantial Completion Date: August 2, 2019 Final Completion Date: August 9, 2019 Construction Budget $291,000.00 Project Location: Work shall be performed under this Contract on the campus of the University of Iowa at Main Campus, Van Allen Hall, 30 North Dubuque Street, Iowa City, Iowa.

Award

$239,507.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
73
Bidding Soon
859
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2019

April 25, 2019

Project location map

30 N Dubuque St, Iowa City, IA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed