Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 20, 2022 at 8:00 PM
Updated October 1, 2024
Renovation of a fire / police facility in Novi, Michigan. Conceptual plans call for the renovation of a fire / police facility.
This request is for the renovation/reconfiguration of Fire Station #3. In early 2014 Sidock Architects performed an architectural assessment and long term needs assessment for all Public Safety facilities. This inspection and evaluation included the physical assessment of each facility's capability to accomplish the operational needs of the Department and to recommend short and long term improvements to further that mission. Fire Station #3 was built in 1978 to serve the southern area of the City of Novi. The station is over 30 years old, but remains in good physical condition. There are signs of the wear and tear of an older facility and general updating of materials and finishes is required. The station is small for modern equipment and facilities. Due to the changes in the fire service in the last 30 years, the station exhibits the pressures of a building not capable of accommodating those changes. There is no room for substantial additions. There is, however, need for increased storage and adequate locker room areas and a separate sleeping area. The renovation includes separate locker and sleeping areas, upgrading the shower rooms and relocation of the site light in the parking lot area. Aligns with City Council goal to invest properly in being a safe community by ensuring that public safety services meets the needs to the community by addressing the facility and resource needs of the stations. The ICMA Study recognized the City's investment and commitment in buildings that are adequate, clean and property maintained. The function of Fire Station #3 has changed and the facilities need to be renovated to accommodate the changes and meet the workload demanded by the citizens of Novi. Failure to make the necessary renovations will result in the continued sharing of workspace areas that would hamper efficiency. Operating costs are anticipated to see a slight increase in janitorial expenses As of June 20, 2022, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Fire / Police
$979,160.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
42785 9 Mile Rd, Novi, MI
Related To This Project
Novi, MI
Bid Date: Jun 23 2022
Novi, MI
Bid Date: May 10 2022
Novi, MI
Bid Date: Jun 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.